background image

 

OPERATION AND MAINTENANCE MANUAL 05/2015 

 

2

 

CONTENTS 

 

1  TECHNICAL DESCRIPTION ........................................................................................................................... 3

 

1.1 PRODUCT DESIGNATION AND IDENTIFICATION .............................................................................. 3

 

1.2 USE ............................................................................................................................................................... 3

 

1.3 TECHNICAL SPECIFICATION .................................................................................................................. 3

 

2 DESIGN ............................................................................................................................................................... 3

 

2.1 DESCRIPTION OF THE VALVE DESIGN ................................................................................................ 3

 

2.2 MATERIALS ................................................................................................................................................ 4

 

2.3 DIMENSIONS .............................................................................................................................................. 4

 

2.4 REFERENCE STANDARDS ....................................................................................................................... 5

 

2.5 ORDERING INFORMATION ..................................................................................................................... 5

 

2.6 PRODUCTION AND ACCEPTANCE ........................................................................................................ 5

 

2.7 MARKINGS ................................................................................................................................................. 5

 

3  PROTECTION, STORAGE & TRANSPORT ................................................................................................... 6

 

3.1 PACKAGING ............................................................................................................................................... 6

 

3.3 STORAGE .................................................................................................................................................... 6

 

3.4 TRANSPORT ............................................................................................................................................... 6

 

4 ASSEMBLY AND INSTALLATION ................................................................................................................. 6

 

4.1 ASSEMBLY GUIDELINES ......................................................................................................................... 6

 

4.2 ASSEMBLY INSTRUCTIONS .................................................................................................................... 7

 

4.3 OPERATION ................................................................................................................................................ 7

 

4.4 OCCUPATIONAL HEALTH AND SAFETY ............................................................................................. 7

 

5 WARRANTY TERMS AND CONDITIONS ...................................................................................................... 7

 

 
 
 

 

Содержание 6534

Страница 1: ...e by President of Factory JAFAR S A Failure to comply with the guidelines and instructions in this Operation and Maintenance Manual releases the manufacturer from all obligations liability and warrant...

Страница 2: ...VALVE DESIGN 3 2 2 MATERIALS 4 2 3 DIMENSIONS 4 2 4 REFERENCE STANDARDS 5 2 5 ORDERING INFORMATION 5 2 6 PRODUCTION AND ACCEPTANCE 5 2 7 MARKINGS 5 3 PROTECTION STORAGE TRANSPORT 6 3 1 PACKAGING 6 3 3...

Страница 3: ...pe 6534 flange to flange check flap valves are designed to transport potable water process water sewage and other liquids as approved by the manufacturer Operating temperature 10 C to 70 C Available d...

Страница 4: ...el grade 1 4310 PN EN 10025 2 2007 PN EN 10088 1 2014 3 Spring 50S2JR Zn Steel grade 1 4310 PN 74 H 84032 PN EN 10088 1 2014 4 Seal Rubber EPDM PN ISO 1629 2005 5 Eye bolt Steel grade 1 0037 Steel gra...

Страница 5: ...screws PN EN 10204 2006 Metallic products Types of inspection documents PN ISO 1629 2005 Rubbers and latices Nomenclature PN EN ISO 1872 1 2000 Plastics Polyethylene PE moulding and extrusion material...

Страница 6: ...ed with heat shrunk film 3 3 STORAGE Store the flange to flange check flap valves in sheltered rooms 3 4 TRANSPORT Transport the flange to flange check flap valves on sheltered vehicles The check flap...

Страница 7: ...he valve downstream of a straight pipeline the length of which is at least 5 times the pipeline nominal diameter 4 3 OPERATION The flange to flange check flap valves shall be operated according to the...

Страница 8: ...L 05 2015 8 The product assembled installed and operated in compliance with this Manual is covered by a commercial warranty from the manufacturer The warranty terms conditions and period are specified...

Отзывы: