manualshive.com logo in svg
background image

Important:  Read complete instructions before beginning installation.

Remove the bath from the carton.  Retain the shipping carton until satisfactory inspection of the product has been made.  Do

not lift the bath by the plumbing at any time; handle by the shell only.

Immediately upon receipt, inspect the shell before installing. Should inspection reveal any damage or defect in the finish, do not

install the bath.  Damage or defect to the finish claimed after the bath is installed is excluded from the warranty. Jacuzzi Whirlpool
Bath's responsibility for shipping damage ceases upon delivery of the products in good order to the carrier.  Refer any claims for
damage to the carrier.  For definitions of warranty coverage and limitations, refer to the published warranty information packed with
the product.

All bath units are factory tested for proper operation and watertight connections prior to shipping.  Note:  Prior to installation,

the bath must be filled with water and operated to check for leaks that may have resulted from shipping damage or
mishandling.
  Jacuzzi Whirlpool Bath is not responsible for any defect that could have been discovered, repaired, or avoided by
following this inspection and testing procedure.

2

Framing and Support

The optional drain/overflow of the bath extends below the bottom of the bath. Note that this requires a cutout in the floor.
The floor structure beneath the bath must be able to support a total weight of approximately 805  pounds (bath, water

and bather) or 60 pounds per square foot.  If the subfloor is level, no other preparation is necessary.  You can proceed to install
the bath.  If the subfloor is not level, you MUST level the entire surface prior to installing the bath.  The use of materials that shim
or provide a level installation are allowed provided the method used will insure a level bath that is supported from the bottom.
Materials that may be used are a floor leveling compound, mortar, plaster or minimal expansion structural foam having a density
of a minimum of 5 lbs./cubic ft.; however the bath must remain level in order for it to drain properly and the foam feet must make
full contact with the mortar, plaster or structural foam foundation.  (The bath must be supported as outlined above.)  Both sides of
a joint or splice of subfloor should be level to each other.  When attaching baths with flanges to stud wall, use shims to fill any
gaps between the bath flange and studs.

The rim of the bath is not designed to support weight.  If finish material is to overlap or contact the bath, the added weight must

be fully self-supporting.

The protective film liner inside the bath is used to prevent damage to the finish from shoes, tools, etc. during

installation.  Before installation, remove liner to inspect for any defects, reapply and do not remove until final cleanup.

The bath unit should be installed after construction of the studwall and rough plumbing is in place.  The bath may be installed

as a single unit or, if necessary, disassembled and installed in three sections.

It is important that the framed pocket be plumb and square and that the framing members be located as detailed in the framing

illustration.  If the bath unit is to be installed in an existing bathroom studwall, additional studs must be added to the dimensions
shown.

 HEADER ON EDGE

BLOCKING REQUIRED IF UNIT
IS INSTALLED IN SECTIONS

16"

33-1/4"

26"

32"

21"

83"

62"

25"

1x2

12"

60-1/4"

FRONT

 OF DOUBLE STUDS

SUB-FLOOR

90º

12"

16"

FRAMING DETAILS (RIGHT HAND SHOWN)

12" x 4" DRAIN
CUT-OUT

90º

Содержание Vantage

Страница 1: ...ifications are subject to change without notice SPECIFICATIONS Each whirlpool bath is arrives ready for installation completely equipped with motor pump assembly and plumbing and fittings necessary fo...

Страница 2: ...you MUST level the entire surface prior to installing the bath The use of materials that shim or provide a level installation are allowed provided the method used will insure a level bath that is sup...

Страница 3: ...dwall blocking Apply a bead of adhesive caulking to the top of the flange surface and place the middle section over the studs of the bath flange Push down firmly to assure that the middlesectionisseat...

Страница 4: ...JETS IF EQUIPPED OPTICA 300 MIXER AND TRANSFER VALVE OPTICA 300 CONNECTIONS ROUGH IN PLUMBING DETAILS COLD IN HOT IN TO FILL SPOUT TO BODY SPRAY JETS IF NOT EQUIPPED PLUG OFF TO SHOWER TRANSFER VALVE...

Страница 5: ...leaking and perma nent damage to the pump Before power is applied totheinstallation makesuretheswitchisintheOFF position to avoid pump damage If installation of an optional timer is desired refer to w...

Страница 6: ...in properly rectify this condition before proceeding with the installation Jacuzzi Whirlpool Bath is not responsible for removal and or reinstallation costs NOTE Watertight installation of the drain i...

Страница 7: ...ENTIAL DAMAGES or losses arising from any cause e g water damage to carpet ceiling loss of use etc including its own negligence damages to respecting or resulting from plated parts when pool and or sp...

Страница 8: ...75370 2168 Call 1 800 288 4002 Toobtainwarrantyreplacementforfactory installedcomponentsforCompanysuppliedoptionsandaccessoriesmanufacturedandsuppliedbytheCompany callorwrite the above Provide a desc...

Отзывы: