![Jacuzzi J-100 Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/jacuzzi/j-100/j-100_owners-manual_3648448018.webp)
J-100
8. Connect wires, color to color, on terminal blocks TB1 and TB3
(Figure C, page 15). TIGHTEN SECURELY! All wires must be
hooked up securely or damage could result.
9. Install control box door and screws and reinstall the cabinet side
panels.
Figure A
Equipment Area
Note: Equipment location (such as pumps, drain, heater etc.) varies by model.
1. Control Box
5.
Pump Drain Plug
2. Power Supply Inlet(s) 6.
1-Speed Pump
3. 2-Speed Pump
7.
Control Panel
4. Heater
3
6
2
2
5
5
1
4
7
Figure B
Control Box
TB1
3
2
1
1. Terminal Block
2. Bonding Lug
3. Grounding Terminal
14
Содержание J-100
Страница 1: ...J 100 COLLECTION OWNER S MANUAL DOMESTIC 6530 592C Rev A...
Страница 42: ...J 100 38...