Luxury Whirlpool Bath
Installation and Operation
www.jacuzzi.com
Page 9
English
Assemble in accordance with the local plumbing or
building codes.
1
Identify drain overflow kit provided with your
bathtub. Remove and open the overflow package
and confirm that all parts are present.
2
Remove washers and nuts from the overflow fitting.
3
Place a small bead of plumbers putty, silicone, or
similar approved sealant around the underside of
the top flange of the overflow fitting.
4
Place the overflow fitting into the overflow hole of
the bathtub (Figure 3).
5
From the underside of the unit, place the rubber
washer then locknut on the overflow fitting and
tighten securely. Be careful not to overtighten.
6
Assemble the remaining drain pieces as shown in
the illustration.
7
After the drain is fully installed, test for proper
drainage. If the unit does not drain properly, rectify
this condition before proceeding with further
bathtub installation.
Watertight installation of the drain and overflow
is the installer’s responsibility. Drain leakage is
excluded from the Jacuzzi Luxury Bath warranty of
this product
Overflow Fitting
Apply sealant/caulking
(commercially available)
Flat Rubber
Washer
Lock Nut
Direct Waste Overflow Drain
Fuzion
™
Specific Material
Fuzion
™
Overflow Drain Installation
Figure 3 - Overflow Installation
The additional design features of the Fuzion™ require that the following steps be completed prior to installing the
bathtub in the constructed surround. The following steps must also be completed in the order specified:
•
Fuzion™ Overflow/Drain Installation
•
Fuzion™ Wood Frame Installation
•
Fuzion™ Control Panel Installation
OPTIONAL - If the Fuzion™ Wood Frame is not being used,
please proceed to Step 2 in the Undermount Installation section.
Fuzion
™
Faucet Installation
Selecting a faucet for rim mounting: The combined thickness at the rim of the bathtub shell and optional
wood deck is 2˝ (50mm) nominal. The length of the faucet tailpiece(s) must be long enough to extend past
this dimension and have ample clearance to assemble any hardware (i.e. locknut, water supply fittings, etc.)
necessary for installation. For undermount units, the combined thickness of the bathtub shell is ½˝ (12mm)
nominal and the undermount deck should not exceed the length of the faucet tailpiece(s), including any
assembly hardware.
Overflow Drain
Assembly
Direct Waste
Overflow Drain
Waste Elbow
Twist and Turn
Drain Assembly
PVC Pipe
PVC Pipe
PVC Flex Pipe
PVC Flex Pipe
PVC Flex Pipe
PVC 45 Elbow
PVC 45
Elbow Street
PVC 45 Elbow Street
PVC 45 Elbow
Содержание HD84000
Страница 2: ...Luxury Whirlpool Bath Page 2 www jacuzzi com Installation and Operation English...
Страница 26: ...Luxury Whirlpool Bath Page 26 www jacuzzi com Installation and Operation English Espa ol...
Страница 50: ...Luxury Whirlpool Bath Page 50 www jacuzzi com Installation and Operation English...