background image

OPERATION

CONTROLLER

To turn ON press ON/OFF button or turn ON water at either shower tower.
The unit will then automatically go into a preheat cycle to heat the air
transmission pipes. There will be a  5 (five) minute pause while the system
preheats. During this time both LEDs will be ON. When ready for drying,
press the ON/OFF button. Heat and air flow will rise together (only at initial
start-up).  After reaching the desired flow, the temperature may be de-
creased or increased using the Temperature button. The air flow may also
be adjusted.

Note: Temperature and air flow are factory set with a predetermined heat
and air speed.

Air Jet (12)

Controller

AIR TOWER

ON/OFF
BUTTON

INCREASE
TEMPERATURE

DECREASE
TEMPERATURE

AIR FLOW LED

AIR FLOW

AIR TEMPERATURE LED

AIR TEMPERATURE

AIR TOWER CONTROLS

17

Jacuzzi Whirlpool Bath

© 

  BY82000    03/05

Содержание BY82000

Страница 1: ...SUMMER RAIN II 2 PERSON SHOWER SYSTEM ONE WALL INSTALLATION AND OPERATING INSTRUCTIONS Jacuzzi Whirlpool Bath BY82000 03 05...

Страница 2: ...user satisfaction We recommend that a licensed contractor perform the installation of all Jacuzzi Whirlpool Bath products Our warranty does not cover improper installation related problems IMPORTANT...

Страница 3: ...16 17 Maintenance __________________________________________________________________________ 18 Tower Fixture Repair Parts _______________________________________________________________ 19 Tower Plu...

Страница 4: ...pping damage ceases upon delivery of the products in good order to the carrier Refer any claims for damage to the carrier For definitions of warranty coverage and limitations refer to the published wa...

Страница 5: ...FERENCE ENCLOSURE SPECIFICATIONS 48 27 11 16 TOP VIEW 72 38 15 16 36 1 TILE FLANGE BLOWER MOTOR FOR UNITS WITH AIR AIR LINE FOR UNITS WITH AIR 84 72 48 FRONT VIEW SIDE VIEW 3 Jacuzzi Whirlpool Bath BY...

Страница 6: ...TER SUPPORT RAIL AIR TOWER WATER TOWER SEAT BASE DOOR POST DOOR POST WATER TOWER WALL POST GLASS SIDE PANEL SUPPORT AND SIDE SUPPORT RAILS NOT SHOWN GLASS SIDE PANEL AIR TOWER WATER TOWER DOOR POST DO...

Страница 7: ...ICONE SEALANT SHOWER BASE RUBBER WASHER FIBER WASHER NUT APPLY LUBRICANT BASE INSTALLATION INSTALLATION INSTRUCTIONS STEP 3 If the subfloor is level no other preparation is neces sary You can proceed...

Страница 8: ...cause a loss of contact with the mortar and void yourwarranty Attachtheshowerbaseflangetothestud wall and blocking with self drilling screws included Use a minimum of 3 screws per flange section NOTE...

Страница 9: ...olor finish can be removed by lightly sanding with 600 grit wet dry sandpaper You can restore the glossy finish to the acrylic surface of the base with a special compound Meguiar s 10 Mirror Glaze If...

Страница 10: ...ge hole on bottom cap of the air tower Checkwithalevelwhenattachingtowerstobase Tighten tower base bolts after leveling 1 bolt per shower tower and 2 bolts for air tower WASHER BOLT 5 16 COLD HOT SHOW...

Страница 11: ...old down brackets but do not tighten screws Check side support rails for level and mark on the finished wall where to attach rail bracket See DETAIL A Drill 3 16 holes and secure bracket with screws a...

Страница 12: ...valve to stub out at bottom of tower Then reconnect braided line using provided gasket Do not twist or kink supply lines when connecting Perform this step for both water towers SHUT OFF VALVES PROVID...

Страница 13: ...st the door with adjusting screw until the glass is parallel with shower base and door moulding mates with water tower mould ing It may be necessary to reposition the door into another slot See STEP 6...

Страница 14: ...the outside edge of the base The fixed glass wall post position may vary slightly due to the anchored location of the water tower STEP 10 Level the post in its proper position and mark where screwhol...

Страница 15: ...13 Installglazinggasketonfixedglasswallspostandjambs on the outside Note orientation of gasket Soapy water may help to insert the glazing gasket NOTE The glazing is to be installed on the outside of e...

Страница 16: ...OVER TOWER TOP PLATE TOWERS AND DOOR INSTALLATION COVER CAP STEP 14 Install fixed glass cover cap on wall post STEP 15 Install all towers top cover STEP 17 Turn on water supply and check for leaks Cor...

Страница 17: ...use abrasive cleaners Use a mild liquid detergent and warm water clean soiled surfaces Use a mild glass cleaner to clean glass panels and doors Paint tar or other difficult stains can be removed with...

Страница 18: ...s proportional to each function when outer knob is positioned between main functions When outer knob is pointing to white line on outer dial face half way between main functions water will be diverted...

Страница 19: ...the ON OFF button Heat and air flow will rise together only at initial start up After reaching the desired flow the temperature may be de creased or increased using the Temperature button The air flow...

Страница 20: ...a product specifically designed for use on acrylic finishes If Meguiar s is not available an acrylic polish of equal quality or automotive paste wax is acceptable The glass can be cleaned with any gla...

Страница 21: ...Gasket 1 41 ID x 063 Thick 6 U547000 Valve Mixer Transfer Assembly 7 U550827 Part of U547000 567000 Nut Mixer Valve Chrome 8 U567000 Gasket 1 9 ID x 063 Thick 9 G432000 Nipple 1 2 Close 10 U217827 Sh...

Страница 22: ...G 7 1 7269000 1 2 PIPE FLEX 5 1 2 LG 8 1 U547000 VALVE MIXER TRANSFER ASSEMBLY 9 1 Y723000 1 2 TEE S x S x THREAD SCH 40 10 1 7269000 1 2 PIPE FLEX 13 75 LG 11 2 U405000 TUBING PVC REINFORCED 31 00 LG...

Страница 23: ...21 Jacuzzi Whirlpool Bath BY82000 03 05...

Страница 24: ...OTICE USE INSTALLATION INSTRUCTIONS SUPPLIED WITH PRODUCT Jacuzzi Whirlpool Bath has obtained applicable code standards listings generally available on a national basis for products of this type It is...

Страница 25: ...naddition THECOMPANYWILLNOTBERESPONSIBLEFORINCIDENTALORCONSEQUENTIALDAMAGESorlossesarisingfromanycause e g waterdamagetocarpet ceiling lossofuse etc includingitsownnegligence damagesto respecting orre...

Страница 26: ...cessoriesmanufacturedandsuppliedbytheCompany callorwritetheabove Provideadescriptionoftheproblemandproofofpurchase Youwillbeinstructedhowtoobtainreplacementsandwheretoreturn at yourexpense thefailedco...

Отзывы: