13
80 cm) to carry out all electrical and hydraulic connections and
any maintenance operations (detail 2). This passage can be
closed using removable under-frames (detail 3), with suitable
supports (detail 4).
It is also necessary to make arrangements for draining, in case
of stagnant water (detail 5) and guarantee suitable ventilation.
Q
In any case, you will need to provide a support base that is
suitable for the load of the hot tub as shown in the table of
weights above.
In the case of intermediate flooring, terraces, roofs or
other similar structures, consult a building engineer.
The support base must be flat and level in order to pro-
vide uniform support for the weight of the hot tub; in
addition, the base of the hot tub must rest completely
on the floor. Otherwise the front panels and/or meth-
acrylate shell could be damaged: this damage is not
covered by the warranty.
The support base must hold the hot tub load, taking
into account the “Weight” tables above.
Arrangement for installation
Q
You can use a garden hose to fill the hot tub.
If the hot tub is connected, for periodic filling, to the
mains system that supplies drinking water, this con-
nection must be carried out in compliance with the
EN1717 norm, using “AA”, “AB” or “AD” anti-pollution
protection procedures. For further information, we
recommend you contact your water supply company
and/or your plumber.
ATTENTION: (IEC 60335-1) The pressure of the hydraulic
system that supplies the equipment must not exceed
600 kPa (6 bar); if the equipment is provided with one or
more solenoid valves for the water supply, the pressure
must have a minimum value of 35 kPa (0.35 bar).
Q
The customer must make provisions for a ground drainage
point of suitable dimensions and that can be inspected for any
cleaning that may be required (
1, det. 1/
3, det. B
).
CAUTION: Before preparing the drainage point, con-
tact your local authority for information on the regula-
tions for draining chemically treated water.
NOTES:
(
3, detail B
) For periodic emptying of the hot tub, proceed
as follows: connect a hose to the drain valve, first removing the
plug and screw on the fitting with its gasket.
NOTE:
if you decide to connect the hot tub permanently to the
ground drainage point, we recommend you install a valve below,
bypassing the valve installed in the factory.
Electrical preparations
Q
The electrical connection for the hot tub (
4
) can be made
as follows:
- single-phase line (220-240V 1~)
- three-phase line consisting of 2 phase cond neutral
conductor (380-415V 2N~)
- three-phase line consisting of 3 phase cond neutral
conductor (380-415V 3N~)
Q
The rated power supply voltage of the equipment is al-
ways 220-240V.
Q
The equipment can also be installed in Countries where
the 220-240V voltage is supplied by a two-phase system. For
the connection please refer to the instruction manual.
Q
The installer must in any case use properly protected cables
Содержание ALIMIA wood
Страница 4: ...4 2 ALIMIA wood ALIMIA synthetic wood ALIMIA built in...
Страница 5: ...5 3 76 cm 5 8 B B 3 4 1 1 2 2 3...
Страница 7: ...7 12 cm 5 ALIMIA synthetic wood wood synthetic wood 6...
Страница 8: ...8 5 1 4 3 3 2 2 4 5 208 cm 7 8...
Страница 27: ...27 Q EN 62471...