5-87
5
M
AI
N
TE
N
AN
C
E
ARBUS 400
Operation chart
Table 9: Operation
Operation chart
Periodicity
daily or
at every
10h
first
30h
every
100h
at every
500h or
every year
every
1000
hours
every
2000
hours
After the work, take off clothing and
take a shower.
Clean the suction filter.
Clean nozzles and their strainers.
Clean nozzles and filters.
•
Check grease fittings and link pins.
•
Wash the sprayer both inside and outside.
•
Lubricate the pump.
•
Check painting for scratches. Retouch
affected part with paint.
•
Check for chemical leaks; if existing, correct leak.
•
Keep the equipment at a dry, sheltered
and ventilated place.
•
Retighten the reservoir fastening bolts.
•
Dismantle the drive shaft covers, clean
and wash parts.
•
Change for the first time the pump oil.
•
Tighten the belts.
•
Clean and revise the pressure regulator
components.
•
Wash the machine inside and outside and apply
lubricating oil with a painting brush to the
parts subject to oxidation.
•
Change the oil of the pump.
•
Perform the preventative maintenance
to the pump.
•
Retighten the reservoir fastening nuts.
•
Replace the belts of the equipament.
•
Replace the bearings if the drive transmission.
•
Replace the pressure gauge.
•
Содержание ARBUS 400
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 28: ......
Страница 30: ......
Страница 36: ......
Страница 40: ......
Страница 42: ......
Страница 78: ......
Страница 80: ......
Страница 98: ......
Страница 100: ......
Страница 103: ...ARBUS400 6 103 6 WARR ANT Y Techinicalinspectionsregistration Date hours No Description Techinical Dealer...
Страница 104: ......
Страница 106: ......