OPERATION 5
en-20
5.11 TOWING / TRAILERING _____________________________________________________
If the mower experiences problems and must be shut
down and removed from the area, it should be loaded
onto a trailer for transport. If a trailer is not available, the
unit can be towed slowly short distances.
Use care when loading and unloading mower. Fasten
mower to trailer to prevent mower from rolling or shifting
during transport.
Long Distance Trailering / Transport.
If the mower is to
be trailered on the highway, before strapping to trailer,
close fuel shut off valve, and inflate tires to the maximum
pressure listed on side of tire. Reduce tire pressure to
normal after removing from trailer.
Before towing, open tow valve. The tow valve permits
moving the mower without starting the engine and
prevents possible damage to hydraulic components.
The tow valve
(U)
is located on the hydraulic drive pump
beneath the operators seat. To open valve, loosen jam
nut
(S)
, and hold while hex stud
(T)
is backed out 3 to 4
turns. Do not loosen or remove tow valve body
(U)
.
Before towing make sure deck is raised. If deck cannot
be raised, remove it from the mower.
Turn the hex stud
(T)
fully in and tighten jam nut
(S)
after
towing.
NOTE:
Do not exceed 2 MPH (3.2 KPH) while towing. Long
distance towing is not recommended
.
Figure 5E
U
S
T
Содержание 69168 - Turfcat T628D
Страница 58: ......