
07610-003-61-42-U
14
STEP
ACTION
RESULT
1.
Apply power (120, 208, or 240 VAC) to the A1 & A2
terminals.
Idle state.
2.
Make control signal connection at B1. No control
signal is applied.
Remains in idle state.
3.
Apply control signal (logic high).
Relay closes (ports 15-18).
4.
Remove control signal (logic low).
Relay remains closed for 2.5 minutes.
NOTE: In Step 4, if control signal is reapplied while the relay is still closed, Step 3 will restart.
TESTING EXHAUST FAN TIMER
INSTALLATION
Содержание TEMPSTAR LT
Страница 33: ...07610 003 61 42 U 26 17 18 6 20 8 2 7 6 6 6 5 32 16 6 6 23 24 4 4 6 6 31 37 39 CONTROL BOX ASSEMBLY PARTS ...
Страница 34: ...27 07610 003 61 42 U CONTROL BOX ASSEMBLY PARTS 10 9 13 14 15 12 11 27 41 42 40 25 21 21 21 22 22 ...
Страница 35: ...07610 003 61 42 U 28 26 1 29 28 30 33 34 36 CONTROL BOX ASSEMBLY PARTS ...
Страница 67: ...07610 003 61 42 U 60 PARTS VENTLESS SYSTEM ASSEMBLY ...
Страница 75: ...07610 003 61 42 U 68 SCHEMATICS 208 230 V 50 60 HZ 1 PHASE ...
Страница 76: ...69 07610 003 61 42 U SCHEMATICS 460 V 50 60 HZ 3 PHASE ...
Страница 77: ...07610 003 61 42 U 70 SCHEMATICS LT NB 208 230 V 50 60 HZ 1 PHASE ...
Страница 78: ...71 07610 003 61 42 U SCHEMATICS LT NB 460 V 50 60 HZ 3 PHASE ...
Страница 79: ...07610 003 61 42 U 72 SCHEMATICS STEAM 208 230 V 50 60 HZ 1 3 PHASE ...
Страница 80: ...73 07610 003 61 42 U SCHEMATICS SDI OPTIONS ...
Страница 81: ...07610 003 61 42 U 74 SCHEMATICS DRAIN QUENCH OPTION ...