8
Installation:
A.
Installing in an outdoor cabinet:
This grill must be safely and correctly installed as a built in, before using. When installing in cabinetry that is built from
combustible materials, a zero clearance mounting kit (part # ZCAN700; Figure 5) must be utilized. IMPORTANT:
framing dimensions for combustible material requires a larger opening than in non-combustible cabinets. Please refer
to the chart below, for correct installation dimensions.
Framing must enclose the grill on the back and sides, but the bottom of the cut-out may be left open. The grill is
supported by the three flanges (left, right and rear), so no support underneath is required. NOTE: please ensure that
fuel line openings provide adequate space for the lines,
CABINET FRAMING DIMENSIONS:
*NOTE; rear cabinet back splash (if applicable) must be non-combustible.
Installation in COMBUSTIBLE Cabinets:
(with ZCAN700)
A
Width (Left to Right)
34
7/8””
88.8 cm
B
Depth (Front to Rear)
19 ¾”
50.2 cm
D
Height (Top to Bottom)
10 3/8”
26.4 cm
C
Total Cabinet Depth
24” min
61 cm
F
Rear Clearance to Cabinet
Vertical*
5 ½”
14 cm
E
Bottom Clearance to
Accessory Doors
3”
7.7 cm
Installation in NON-COMBUSTIBLE Cabinets (Fig.6)
A
Width
32
½”
82.7 cm
B
Depth (Front to Rear)
18”
45.8 cm
D
Height (Top to Bottom)
10”
25.5 cm
C
Total Cabinet Depth
24” min
61 cm
F
Rear Clearance to Cabinet
Vertical*
5
½”
14 cm
E
Bottom Clearance to Accessory
Doors
3”
7.7 cm
ZCAN700 before installation
Example of an Installation in
Non-Combustible materials: cement
board and metal studs. (Grill raised
for illustration purposes).
Figure 7
Figure 6
**
!WARNING!
Please ensure that fuel lines are
run between the Grease Pan and
the ZCCAN, and NOT above the
Grease Pan.
Содержание JLS700BI
Страница 20: ...20 Exploded View JLS700BI Built In ...