REL1.3
Page 71 of 80
RZ/G1M/G1N Qseven SOM Hardware User Guide
iWave Systems Technologies Pvt. Ltd.
3.1.2
Power Input Sequencing
The RZ/G1M/G1N Qseven SOM
’s
Power Input sequence requirement is explained below.
Power up Sequence:
•
VCC_RTC must come up at the same time or before VCC comes up.
•
PWGIN signal from Qseven Edge must be active at the same time or after VCC comes up.
Power down Sequence:
•
PWGIN signal from Qseven Edge must be inactive at the same time or before VCC goes down.
•
VCC must go down at the same time or before VCC_RTC goes down.
Figure 11: Qseven SOM Power Sequence
Table 15: Power Sequence Timing
Item
Description
Value
T1
VCC_RTC rise time to VCC rise time
≥ 0 ms
T2
VCC rise time to PWGIN rise time
≥ 0 ms
T3
PWGIN fall time to VCC fall time
≥ 0 ms
T4
VCC fall time to VCC_RTC fall time
≥ 0 ms
Содержание iW-RainboW-G20M
Страница 66: ...REL1 3 Page 66 of 80 RZ G1M G1N Qseven SOM Hardware User Guide iWave Systems Technologies Pvt Ltd...
Страница 67: ...REL1 3 Page 67 of 80 RZ G1M G1N Qseven SOM Hardware User Guide iWave Systems Technologies Pvt Ltd...
Страница 68: ...REL1 3 Page 68 of 80 RZ G1M G1N Qseven SOM Hardware User Guide iWave Systems Technologies Pvt Ltd...
Страница 69: ...REL1 3 Page 69 of 80 RZ G1M G1N Qseven SOM Hardware User Guide iWave Systems Technologies Pvt Ltd...
Страница 80: ...REL1 3 Page 80 of 80 RZ G1M G1N Qseven SOM Hardware User Guide iWave Systems Technologies Pvt Ltd...