7
High Voltage Probe HV-P60A
4. Measuring method
4.1 Installation and connection
(1) Connection and fixation of Probe body side
A. When Probe body is set up and used for the stand
* Refer to following 1) to 5) and Figure 4(a).
1) The banana chip terminal (green) for the playground in the
stand is inserted in the terminal GND of the bottom of
Probe body.
2) The output cable is passed from the hole plug on the stand
side, and it is drawn out through the hole in the probe
receiving part.
3) The output cable is connected with the bottom of Probe
body.
4) Probe body is inserted in the probe receiving part and is
tightened with two fixed screws to be fixed.
5) Please connect the terminal GND of the probe stand with
earth GND for safety.
Figure 4(a) Probe body HV-P60A and Probe stand SK-301
Probe body
HV-P60A
Probe stand
SK-301
Probe receiving part
Hole plug
* Hole to pass cable from output
of the bottom of
Probe body
Ground lead
Fixed screws
GND Terminal of
Probe stand
Содержание HV-P30A
Страница 1: ...High Voltage Probe HV P60A Instruction Manual ...
Страница 2: ...Ⓒ2015 IWATSU TEST INSTRUMENTS CORPORATION All rights reserved ...
Страница 24: ...14 High Voltage Probe HV P60A Maximum input voltage DC Peak AC ...
Страница 25: ...15 High Voltage Probe HV P60A 5 2 Appearance Unit mm ...
Страница 27: ...HV P60A ...