![IVRA BTS c-Go Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/ivra/bts-c-go/bts-c-go_instruction-manual_2097695009.webp)
English
9
2.
Enter the battery parameters:
a.
Select the battery type.
b.
Enter the C5 capacity. (The C5 capacity is the specified capacity for a 5 hours
discharge.)
c.
Description is optional, but useful in the list of results.
d.
When a battery has not been charged properly, it can be worthwhile to recondition
the battery by increasing the discharge/charge cycles. If you do not wish to
recondition the battery you can leave the default option to 1.
The voltage 12V/24V is automatically detected. 24V batteries can only be tested if the BTS
has also a 24V charger inside (Option for 4-channel model only).
A set of two 12V batteries in series must be split and the 12V batteries must be tested
separately because their capacities may differ.
Usually only 24V Lithium ion battery packs are tested as 24V batteries.
Содержание BTS c-Go
Страница 1: ...1 BTS Battery Test System 2 4 Channel Instruction manual GB...
Страница 7: ...English 7 In the next screen press Language In the next screen choose the required language...
Страница 10: ...English 10 3 Start the test by the button Test battery channel x...
Страница 17: ...English 17...