![iVex Indusvision IVEX-FZ Скачать руководство пользователя страница 13](http://html.mh-extra.com/html/ivex-indusvision/ivex-fz/ivex-fz_user-manual_2097416013.webp)
13
6. Checklist Before Installation
No.
Check Point
Check
1
Please use the power supply (SMPS) that is supplied from factory or your
provider and be careful to connect specification of the power supply.
(DC24V, AC220V / AC110V)
2
Please connect exactly polarity (+/-) of the Data Cable (RS-485).
3
Please check the video quality by connecting video cable(BNC Connector)
to DVR or Monitor.
4
After connecting CAT. 5 cable (RJ-45 Jack) to network port, please check the
video, data control and other conditions in the normal network condition.
5
Please set the protocol and baud rates as following:
- Protocol/Baud Rate : Pelco-D / 9600 bps
- ID Address : No. 1 (Default)
6
In IP Network Camera, please set and save exactly PELCO-D, 9600 bps and
ID Address in the supplied CMS or NVR software.
7
Check WIPER operation (Left/Right)
(Press No.85 and Preset-key: ON, Press No. 69 and Preset-key : OFF)
1.
When you receive, please check the product according to the following checklist before
installation in the site and if you find the normal for all, please install the goods.
2
. Please be noted it could be charged for some service if you don’t remind the checklist.
(Please contact to
or following phone number, if you have troubles
out of check list.)
INDUSVISION INC / CS Technical Team : +82-32-623-0750
Содержание IVEX-FZ
Страница 15: ...15 8 1 Dimension DIMENSION Unit mm ...
Страница 16: ...16 8 2 Dimension IVEX FZ WB Unit mm ...