HYDRAULIC CONNECTION 

 
The choice and installation of the system components is the responsibility of 
the installer who must operate in accordance with correct working practice and 
the current legislation. 
Here are some recommendations that should be taken in consideration: 
 
-

 

the boiler fittings and the safety valves must not be strained by the 

weight of the system connection pipes: this can be dangerous for the boiler 
and the latter must therefore be sustained and appropriately positioned  
 
-

 

Cut-off devices must not under any circumstances be fitted between the 

boiler and the expansion vessel and between the boiler and the safety valves. 
 
-

 

The expansion vessel must be correctly sized (there must be no leaks of 

water due to normal expansion) and, if the expansion vessel is closed, the 
safety valves must open only in exceptional cases in order to minimise any 
subsequent introduction of water and in any case to ensure that it is 
introduced and controlled by one single point in the system. 
 
-

 

Ensure that the safety valve outlets are connected to an outlet funnel. If 

not, when the valves cut in they will flood the room and the manufacturer will 
accept no liability for this.  
 
-

 

Ensure that the hydraulic pipes are not used as earth connections for the 

electrical or telephone system. They are not suitable for this use and can 
rapidly deteriorate leading to serious damage.  
 
-

 

Before connecting up the boiler, wash all the system pipes to remove any 

debris that could affect correct operation.  
 
-

 

 If the water available for filling the system is hard (> 15 French degrees) 

or corrosive (pH < 7.2), a treatment plant should be provided otherwise 
permanent damage can occur.  
 
-

 

If the mains water supply contains impurities, a suitable filter must be   

        fitted. 

 

-

 

Avoid any accidental contact between the heating system water and the 

sanitary water as the former is not drinkable. 
 
-

 

After connection to the hydraulic system, ensure that the latter is 

completely de-aerated. 
 
 

 

 
You are advised to insulate the heating system pipes to avoid heat dispersion 
resulting in increased fuel consumption and environmental pollution. 
 
 

ELECTRICAL SYSTEM

 

 
The electrical system must comply with the current regulations and be 
installed by professionally qualified personnel.. 
 
Electrical safety of the equipment is ensured only when it is correctly 
connected to an efficient earth system in compliance with the current safety 
regulations. 
The manufacturer will not be liable for any damage caused by failure to earth 
the system. 
 
Call professionally qualified personnel to check that the electrical system is 
suitable for the maximum power absorbed by the equipment, ensuring in 
particular that the system cable sections are suitable for the power absorbed 
by the equipment. 
 
Adapters, multiple sockets and extension leads must not be used for general 
power supply of the equipment from the mains. 
 
For connection to the  mains, a twin-pole switch must be provided in 
compliance with the current regulations. 
 
 

THE CONDENSATE PROBLEM 

 
The condensation of the steam contained in the discharge smokes of the boiler 
(condensate), appears when the boiler temperature returning in the boiler is 
less than 50°C and it is important above all during the morning start up after 
than the boiler has been switched off all night long. 
 
The condensate is acid and corrosive and, with the passing of time, corrodes 
the plates of the boiler. 
 
To avoid the formation of condensate as much as possible, an anticondensate 
pump must be installed as describe below.  
 
When the burner starts, a thermostat (calibrated to 55 °C) which is placed on 
the return water pipe makes contact, and starts the anticondensate pump to 
reach the stated temperature, and the temporaly extinguishes the 
anticondensate pump and switches on the unit pump. 
 

Содержание SUPERAC 1045 SUPERAC 1220

Страница 1: ...RONA Italy Telefono 045 6680082 Telefax 045 6680051 P IVA 02835480233 e mail info ivarindustry it Web site www ivarindustry it code ist Superac ing rev 01 INSTRUCTIONS BOOKLET F o r i n s t a l l a t i o n u s e a n d m a i n t e n a n c e HOT WATER BOILERS SUPERAC ...

Страница 2: ......

Страница 3: ...in this booklet and have regular maintenance performed by qualified personnel We would like to remind you that failure to follow the instructions contained in this booklet may invalidate the guarantee 0 0 8 5 IMPORTANT It is possible to install on these boilers even other burners that are not included in the enclosed lists provided that the required values of furnace thermal output and counterpres...

Страница 4: ...allation premises page 15 Discharge of combustion products page 15 Hydraulic connection page 16 Electrical system page 17 The condensate problem page 17 Fuel supply page 19 Burner connection page 19 Cover assembling only SUPERAC 93 1045 page 20 Control panel assembly page 22 ASSISTANCE AND MAINTENANCE Preliminary operations prior to first start up page 23 First start up page 24 First start up and ...

Страница 5: ......

Страница 6: ......

Страница 7: ...ve regular maintenance performed by professionally qualified personnel following the manufacturer s instructions Any repairs to the appliance must be carried out using only original spare parts If you decide not to use the appliance for a long period ensure you have professionally qualified personnel to carry out the necessary operations to preserve the generator set the boiler main switch and the...

Страница 8: ......

Страница 9: ......

Страница 10: ...e If you notice smell of gas do not turn on electric switches household appliances telephone or any other objects that could cause sparks If this is the case open doors and windows immediately to clear the air in the room turn off the fuel taps contact professional qualified personnel Do not touch the appliance with wet or damp parts of the body and or with bare feet Do not perform any maintenance...

Страница 11: ......

Страница 12: ......

Страница 13: ...f The electrical diagram is housed inside the control panel An electronic climate adjusting system can be installed on request and provides the boiler temperature adjustment as well as many other auxiliary functions CHECKS AFTER BOILER CLEANING OPERATIONS After performing maintenance and cleaning operations repeat the preliminary start up inspection see page 23 check the burner calibration and per...

Страница 14: ......

Страница 15: ......

Страница 16: ...elease the regulation jam nuts without let them go out from the bush seat of the door tighten the locking screw only as far as required to censure a uniform airtight closure lock the regulation jam nuts against the door bush Normally at all maintenance operations the door adjustment should be inspected CLEANING THE BOILER The boiler should be cleaned at least once a year to remove carbon deposits ...

Страница 17: ......

Страница 18: ... 899 1027 1156 kW Furnace counterpressure 3 3 4 3 4 8 4 5 5 6 5 4 6 mbar Water side loading loss t 15 C 18 22 28 18 25 33 40 mbar Boiler water content 402 402 476 697 795 733 817 dm3 Max boiler working pressure 6 6 6 6 6 6 6 bar Min boiler return temperature allowed 50 50 50 50 50 50 50 C Max boiler temperature allowed 100 100 100 100 100 100 100 C Weight in empty conditions 900 910 1000 1270 1400...

Страница 19: ...Weight in empty conditions 2100 2350 3450 3850 5200 5800 8000 kg ...

Страница 20: ......

Страница 21: ...s from approx 170 200 C When the boiler is working the pressure of the water contained in the system increases Therefore ensure that its highest value does not exceed the boiler max pressure MAINTENANCE Periodical maintenance is essential for safety output and the generator life span Furthermore it is mandatory and it must be carried out by professional qualified personnel Before any servicing it ...

Страница 22: ......

Страница 23: ......

Страница 24: ...nce for the gaskets of the door of the burner plate and of the smokebox to prevent leakage of toxic and therefore hazardous combustion fumes into the boiler room To guarantee the perfect seal warm tighten The weight of the overhanging burner tends to loosen the gasket of the door at the top IDENTIFICATION ELEMENTS The appliance can be identified through the TECHNICAL PLATE that contains the perfor...

Страница 25: ......

Страница 26: ...the system will run automatically In case of ignition failures or malfunctioning turn off the appliance and contact professionally qualified personnel PRELIMINARY OPERATIONS PRIOR TO STARTING UP FOR THE FIRST TIME Before starting up check that the gauges of setting and control instruments have been correctly positioned in the bulbs ensure that the turbolators do not protrude from the front of smok...

Страница 27: ......

Страница 28: ......

Страница 29: ...URNING OFF In the event of temporary periods of inactivity week ends short trips etc with no danger of frost follow the procedure below turn off the main switch on the control panel OFF turn of the plant main switch CAUTION if there is danger of frost do not carry out the above operations but set the ambient thermostat on approx 10 C In the event of a long period of inactivity follow the procedure...

Страница 30: ......

Страница 31: ...eal the fissure of the burner nozzle is placed into the boiler furnace Handle the boiler body using appropriate equipment using the lifting hooks of the boiler upper part Due to ist heavy weight it should not be handled manually 12 Position the superior covers 4 5 on the boiler Before joining them together prepare the control panel 6 as specified below and fix it on the right superior panel as fol...

Страница 32: ......

Страница 33: ...bber hose remove the intake on the flame pilot light and close the hole with a tap ø 1 8 GAS The fuel connections to the burner must be positioned in order to permit complete opening of the boiler door with the burner fitted COVER ASSEMBLING only SUPERAC 93 1045 WARNING carry out the cover assembling after finished the installation works Extract the mineral wool 1 from the furnace and wrap it arou...

Страница 34: ......

Страница 35: ......

Страница 36: ...fety and control devices prescribed by the current regulations Never use the plant fuel pipes to earth electric or telephone systems Ensure that the boiler can be fed with the type of fuel that will be used BURNER CONNECTION For installation of the burner the electrical connections and the necessary settings consult the burner instruction manual Ascertain that the correct type of burner has been c...

Страница 37: ...ons and minimum distances provided for by the current regulations and is provided with suitably sized air vents The flat surface of the boiler must be positioned horizontally The flat surface should be raised from the floor CAUTION if the burner is supplied with combustible gas with specific weight higher than the specific weight of air the electric parts must be positioned above 0 5 meters from g...

Страница 38: ......

Страница 39: ......

Страница 40: ... the heating system water and the sanitary water as the former is not drinkable After c onnection to the hydraulic system ensure that the latter is completely de aerated You are advised to insulate the heating system pipes to avoid heat dispersion resulting in increased fuel consumption and environmental pollution ELECTRICAL SYSTEM The electrical system must comply with the current regulations and...

Страница 41: ... mm B 1990 1990 2290 2345 2545 2545 2795 mm H 1150 1150 1150 1280 1280 1280 1280 mm A1 1000 1000 1000 1200 1200 1200 1200 mm Dimensions B1 1512 1512 1812 1814 2014 2014 2264 mm d 595 595 595 640 640 640 640 mm e 625 625 625 625 625 625 625 mm f 792 792 1092 974 1174 1174 1424 mm r m 80 80 80 100 100 100 100 DN Fittings v 2 2 2 65 65 65 65 DN s DN 250 250 250 350 350 350 350 mm MODEL S U P E R A C ...

Страница 42: ...Fittings v 80 80 100 100 125 125 125 DN s 1 1 2 1 1 2 1 1 2 1 1 2 1 1 2 1 1 2 1 1 2 DN 400 400 450 450 500 500 600 mm ...

Отзывы: