background image

3

5200199 Rev. F

One-Point Ionizer with S Power Supply

corresponding AC receptacle of the voltage and frequency marked on the nameplate and 

with a good electrical ground connection for the ground pin of the plug.  If a grounded 

socket is not available, either bolt the power supply to a well-grounded metal machine 

frame or connect a heavy copper wire from the ground terminal on the rear of the power 

supply to a well-grounded electrical conduit or to a cold water pipe.
To add a second one-point ionizer to an installation, pull the plastic plug off the second 

high voltage receptacle on the power supply and connect the second one-point ionizer.

NOTE

 – When adding or removing ionizers or changing to any other type of ionizer 

bar or equipment, be sure to check with Simco-Ion for instructions before 

proceeding.

Mounting the Power Supply

Mount the power supply to the machine frame (preferable on the side away from the 

operator) or to a convenient wall or post (preferably with the HV terminals down).

Cable Supports

Cable supports are used to guide the high voltage cables from the ionizers along the frame 

of the machine to the power supply.  Cable should always be kept at least ¼” away from 

the grounded machine frame, parts, wall, and ceiling.  If it must touch at any point, it 

should be encased in protective plastic tubing available from Simco-Ion.  To install the 

cable supports, press the split bushing out of the metal support and apply the bushing to the 

cable at the desired location.  Mount the support, then press the bushing with cable back 

into the support. Be sure that a cable support is located to remove all strain and motion 

from the cable where it enters a static ionizer and the power supply.

Grounding

Frame of the Machine – it is essential for successful operation of the equipment that the 

frame of the machine be electrically grounded, either through well grounded electrical 

conduit, or by a heavy copper wire connecting the frame to a cold water pipe.

Ionizers

 – The metal casing must be grounded.  If the casing is not grounded, personnel 

may receive a shock by touching it and, in addition, the equipment will not function 

properly.  Grounding is automatic when metal mounting clamps and brackets support 

the ionizers directly from the grounded metal machine frame.  When the ionizers are 

supported from wooden or other non-conductive members, a separate wire must connect 

the mounting bracket on one end of the ionizer to a metal part of the grounded machine 

frame or to a well grounded conduit or cold water pipe.

Power Supply

 – The power supply must be grounded either by bolting it to the grounded 

machine frame or by attaching a heavy copper wire to the ground terminal and to a well 

grounded electrical conduit or cold water pipe.

Содержание Simco ION

Страница 1: ...One Point Ionizer with S Power Supply 5200199 Rev F INSTALLATION AND OPERATING INSTRUCTIONS One Point Ionizer with S Power Supply ...

Страница 2: ...er Supply TABLE OF CONTENTS 1 SAFETY WARNINGS 1 2 INSTALLATION 2 One point Ionizer Location 2 Installation 2 Mounting the Power Supply 3 Cable Supports 3 Grounding 3 Checking for Proper Operation 4 3 MAINTENANCE 4 4 TROUBLESHOOTING 4 5 WARRANTY 5 ...

Страница 3: ...t must be correctly installed and maintained Adhere to the following cautions for safe installation and operation 1 Read the complete Operation Manual before operating Failure to follow instructions may result in damage to the ionizer and or personal injury 2 Disconnect line voltage to power supply before connecting high voltage cable 3 A factory qualified service technician must perform component...

Страница 4: ...ischarged The casing of the one point ionizer should not be less than 3 8 nor more than 3 from the material to be discharged For best operation keep between and 1 The material should not contact the ionizer Installation Mount each ionizer to the machine by means of the mounting clamp provided Wrap the 7 16 clamp around the ionizer and bolt clamp directly to a grounded machine frame or to the perfo...

Страница 5: ... it should be encased in protective plastic tubing available from Simco Ion To install the cable supports press the split bushing out of the metal support and apply the bushing to the cable at the desired location Mount the support then press the bushing with cable back into the support Be sure that a cable support is located to remove all strain and motion from the cable where it enters a static ...

Страница 6: ... their sharpness and decrease efficiency One easy way to remove built up deposits is to occasionally press a soft pencil eraser down over each point in turn and twist slightly Including the one point ionizers in the regular procedure of cleaning the machine will pay dividends in service and excellence of performance 4 TROUBLESHOOTING If equipment fails to function properly check connections to be ...

Страница 7: ...ne year from the date of purchase The equipment being returned under warranty should be shipped by the purchaser to Simco Ion 2257 North Penn Road Hatfield PA 19440 transportation prepaid and insured for its replacement cost Prior to returning any goods for any reason contact Simco Ion Customer Service at 215 822 6401 for a Return Authorization Number This number must accompany all returned items ...

Страница 8: ...Point Ionizer with S Power Supply 5200199 Rev F Simco Ion 2257 North Penn Road Hatfield PA 19440 215 822 6401 800 203 3419 www simco ion com customerservice simco ion com 2015 Simco Ion Printed in the U S A ...

Отзывы:

Похожие инструкции для Simco ION