background image

10

CONVEYOSTAT

IN-LINE IONIZER

5100577 Rev J

6. MAINTENANCE

CAUTION

 – Maintenance must be performed by qualified service personnel 

only.

CAUTION – Electrical Shock Hazard

Turn off power supply before cleaning bar or performing any maintenance on 

the system.

Power Supply

Under normal conditions, the power supply requires no periodic maintenance.  Occasionally 

check to make certain all ground and electrical connections are clean and tight.

Conveyostat In-line Ionizer

Periodic cleaning of the static bars on the Conveyostat is necessary.  Turn power OFF to 

the system before cleaning the static bar.
Cleaning frequency of the static bar emitter pins, located inside the Conveyostat, depends 

on the type of material being run through the tube, humidity, air velocity and other factors.  

The Conveyostat may be self-cleaning in certain applications where contaminants are 

wiped from the emitter pins by bulk solids flowing through the system.  Each unit should 

be inspected frequently when first installed to determine how often cleaning is needed.
To clean emitter pins, obtain access to the inside of the Conveyostat.  This may be 

achieved through access doors built into the unit or by removing one or both ends of the 

unit from its placement in the conveying line.
A cleaning brush with nylon bristles should be used to keep the ionizing pins of the bar 

clean.  Periodic use of the brush will prevent deposits from accumulating on the pins.  The 

ionizing pins must remain sharp for optimum operation.

NOTE

 – Do not scrape pins with any hard of sharp object that may damage points.

Built-up deposits on the points may be removed by pressing a soft pencil eraser down over 

each point and then twisting the pencil.  A clean emitter point will have a shiny polished 

appearance
Inspect the static bars for physical damage such as missing pins and cracked (or broken) 

housings.  Such damage would most likely occur from foreign particles traveling through 

the unit.  Abrasive wear on the exposed surfaces of the static bar is to be expected in 

normal operations.  Wear depends on the materials being conveyed.

Содержание Simco Ion Conveyostat

Страница 1: ...Conveyostat In Line Ionizer For Pneumatic Conveyors INSTALLATION AND OPERATING INSTRUCTIONS...

Страница 2: ...This page intentionally left blank...

Страница 3: ...Features 2 Receipt of Equipment 2 Return Shipments 2 3 SPECIFICATIONS 3 4 INSTALLATION 4 Mounting and Grounding the Power Supply 5 High Voltage Connections 5 Installation of Conveyostat In Line Ioniz...

Страница 4: ...AUTION This equipment must be correctly installed and properly maintained Adhere to the following cautions for safe installation and operation 1 Read instruction manual before operating or installing...

Страница 5: ...tective outer bellows and liquid tight conduit to help protect the high voltage cables from the environment Outdoor bellows can be easily unclamped and re clamped during installation to provide access...

Страница 6: ...to 12 larger diameters available Cable Length 10 ft from housing to power supply other lengths available Power Supply Simco Ion s Dual Phase Power Supply produces high voltage to generate both positiv...

Страница 7: ...y supplied Do not remove equipment or add equipment without first consulting a Simco Ion representative 2 Both indoor and outdoor power supplies consist of two transformers Phase A and Phase B housed...

Страница 8: ...ers in the power supply Because we are using high voltage 4000 VAC and sources that are out of phase with each other it is important that the black cables be separate from each other and isolated from...

Страница 9: ...it s case 5 Strip 3 8 insulation from the end of the high voltage cable and insert the cable through a straight through fitting 6 Loosen one of the connection screws on the high voltage output termina...

Страница 10: ...oved fittings is recommended not supplied On installations subject to Canadian Standards Approval the use of conduit is required 3 For flexible connection to power unit the use of local code approved...

Страница 11: ...easily observed as clogs and material sticking 2 The Conveyostat must be installed in the line with the flow direction of the material being from the cable end side of the static bar thru to the dead...

Страница 12: ...he unit Always turn the power OFF when the equipment is not in use A Check System warning indicator is located on the face of the Power Supply Loss of high voltage or a short circuit within the Convey...

Страница 13: ...should be inspected frequently when first installed to determine how often cleaning is needed To clean emitter pins obtain access to the inside of the Conveyostat This may be achieved through access...

Страница 14: ...6401 for a Return Authorization Number This number must accompany all returned items This warranty does not apply when the equipment has been tampered with misused improperly installed altered has rec...

Страница 15: ...12 CONVEYOSTAT IN LINE IONIZER 5100577 Rev J This page intentionally left blank...

Страница 16: ...5100577 Rev J CONVEYOSTAT IN LINE IONIZER Simco Ion 2257 North Penn Road Hatfield PA 19440 215 822 6401 800 203 3419 www simco ion com customerservice simco ion com 2017 Simco Ion Printed in the U S A...

Отзывы: