Operation Manual – AXA 2400 Compact – 30 - 90 kVA
Service, Maintenance, Overhaul
Document no. 578.650BB
Page 60 of 91
8.0
Service, Maintenance, Overhaul
To make certain that the unit is always ready for use it must be maintained on a regular basis.
Only qualified personnel should remove covers for service, maintenance or overhaul purposes.
8.1
Recommended Maintenance Schedule
•
Check aircraft connector.
Daily / upon use
•
Check output cable for damaged insulation.
Weekly
•
Verify function of the 90% Switch, if present.
Quarterly
•
Check air-filters - Wash or change as appropriate.
Quarterly
•
Check that all fans are running properly.
Yearly
(use Boost mode in Fan Control setup submenu)
•
Check rubber seals at front door, rear panel.
Yearly
•
Check internal bolt/screw and wire connections.
Yearly
•
Visual inspection of PCB's - control unit / gate drive.
Yearly
•
Verify proper operation of the output contactors' contact sets and coil
Yearly
•
Verify the output voltage at aircraft connector(s) with and without load
Yearly
Especially for mobile units
•
Check tires for wear and tear
Yearly
•
Check correct air pressure (4.3 Bar = 62 PSI)
Quarterly