Contents
1.
General & Applications
2.
Assembly & Installation
2.1. Reactor
2.1.1. Assembly of Reactor
2.1.2. Installation of Quartz Sleeve and of UV Lamp
2.1.2.1. Cleaning and Replacement of Quartz Sleeve
2.1.2.2. Fitting of UV Sensor (only for Maxima)
2.1.3. Connection to the Water Line Network
2.2. Control System
2.2.1. Assembly of Control Box
2.2.2. Electrical Connection
2.2.3. Connection of UV Lamp
3.
Commissioning
3.1.
Units with Solenoid Valve
3.1.1. Units without Solenoid Valve
3.2.
Tightness Test
4.
Software
4.1.
Alarm Messages
4.2.
New Start after Replacement of UV Lamp
5.
Exploded Diagram
6.
Spare Parts List
7.
Declaration of conformity (page 82)
ATTENTION:
Please read this manual carefully and follow the instructions given in it.
Installation must be carried out only by authorized technicians.
2
Содержание WEDECO Aquada
Страница 20: ......
Страница 40: ...40...
Страница 60: ......
Страница 81: ...81 I...
Страница 82: ...82...