Installation
XHD Installation, Operation, and Maintenance Manual
20
Foundation requirements
Requirements
•
All equipment being installed must be properly grounded to prevent unexpected static
electric discharge. If not, a static electric discharge may occur when the pump is drained
and disassembled for maintenance purposes.
• The location and size of the foundation bolt holes must match those shown on the
assembly drawing provided with the pump data package.
• The foundation must weigh between two and three times the weight of the complete pump,
baseplate, and drive assembly.
• Provide a flat, substantial concrete foundation in order to prevent strain and distortion
when you tighten the foundation bolts.
Sleeve-type bolts
Item Description
1.
Baseplate
2.
Shims
3.
Foundation
4.
Sleeve
5.
Dam
6.
Bolt
Figure 9: Sleeve type bolts
J-type bolts
Item Description
1.
Baseplate
2.
Shims or wedges
3.
Foundation
4.
Dam
5.
Bolt
Figure 10: J-type bolts
Содержание Goulds Pumps XHD
Страница 1: ...Installation Operation and Maintenance Manual XHD ...
Страница 2: ......
Страница 27: ...Installation XHD Installation Operation and Maintenance Manual 25 Direct coupled baseplate leveling worksheet ...
Страница 147: ...Parts Listings and Cross Sectionals XHD Installation Operation and Maintenance Manual 145 Figure 130 Optional features ...
Страница 151: ...Parts Listings and Cross Sectionals XHD Installation Operation and Maintenance Manual 149 ...
Страница 153: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 151 ...
Страница 154: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 152 ATEX notification ...
Страница 155: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 153 IECEx Certificate of Conformity ...
Страница 156: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 154 ...
Страница 157: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 155 Chinese Certificate of Conformity ...