Table of Contents
1 Safety..................................................................................................................................................................3
1.1 Important Safety Notice.............................................................................................................................3
1.2 Safety warnings.........................................................................................................................................3
1.3 Safety ........................................................................................................................................................4
1.4 General precautions ..................................................................................................................................5
1.5 ATEX Considerations and Intended Use.................................................................................................. 8
1.6 Parts ..........................................................................................................................................................9
2.1 Introduction..............................................................................................................................................10
2.2 Receiving and Checking..........................................................................................................................10
2.3
Materials and Equipment Required.........................................................................................................10
3 Storage ............................................................................................................................................................12
3.1 Storage....................................................................................................................................................12
3.2 Storage Preparation ................................................................................................................................12
3.3 Recommended Storage Procedures .......................................................................................................12
3.4
Preparations for Uncontrolled Long Term Storage.................................................................................. 12
4 General Description .......................................................................................................................................13
5.1 Pump Installation.....................................................................................................................................16
5.2 Preparing the Foundation........................................................................................................................16
5.3 Preparation for Installation ......................................................................................................................17
5.4 Checking Resistance...............................................................................................................................17
5.5 Energizing the Motor ...............................................................................................................................18
5.6 Lowering Pump into Well.........................................................................................................................19
5.7 Current Check .........................................................................................................................................19
5.8 Voltage Check .........................................................................................................................................19
5.9 Electrical Cable .......................................................................................................................................20
5.10
Electrical Control Equipment...................................................................................................................20
5.11 Airline Installation and Operation...........................................................................................................20
6 General ............................................................................................................................................................22
6.1 Operation at Shutoff Heads.....................................................................................................................22
7 Pump Disassembly and Reassembly ...........................................................................................................23
7.1 Pump Disassembly..................................................................................................................................23
7.2 Bowl Disassembly ...................................................................................................................................23
7.3 Turbine Bowl-Wear Rings Removal ........................................................................................................27
7.4 Turbine Bowl-Impeller Wear Ring Removal ............................................................................................ 28
7.5 Bowl, Suction Bell, and Discharge Bowl Bearing Removal ..................................................................... 28
7.6 Inspection and Replacement...................................................................................................................28
7.7 Turbine Bowl and Impeller Wear Ring Installation................................................................................... 28
7.8 Bowl, Suction Bell, and Discharge Bowl Bearing Installation .................................................................. 28
Table of Contents
VIS Installation, Operation and Maintenance Instructions
1
Содержание Goulds Pumps VIS
Страница 1: ...Installation Operation and Maintenance Instructions VIS ...
Страница 2: ......