FAST
STARTQUICK
GOAL
R
K
STEP BY STEP ASSEMBLY
STEP 2
Insert Blanking Cap part
C
and
insert Large Quick Release Button
H
(x2)
into Corner Bracket
X.
(NOTE: CornerBracket
X
is different from Corner Bracket
A
. Corner
Bracket X is to be fitted into the upright posts
and has 8 holes.
STEP 4
Insert Small Quick Release
Black Button
I
into the Spigot
B
.
Insert Spigot
B
and insert
H
(x2)
into two of the Corner Bracket
A.
(NOTE: Corner Bracket
A
has 4 holes for locks)
STEP 3
Insert Blanking Cap part
C
and
insert Large Quick Release Button
H
(x2) into Corner Bracket
A.
(NOTE: Corner Bracket
A
has
4 holes.)
STEP 6
Insert Corner Brackets
X
into the
upright posts
O
(uprights have logos on the side)
STEP 7
Insert Corner Brackets
A
into
each end of the crossbar L
STEP 8
Insert Corner Brackets
A
into
each end of the Backbar
M
STEP 9
Attach Side bars
N
to
the ground back bar by slotting
into the corners brackets
STEP 10
locking button)
into
FB
and connect Folding
Bracket
FB
on the upright
posts. Attach Uprights
O
to the Side bars
N
STEP 11
Attach Crossbar
L
to uprights
O
STEP 5
Insert Arrow Head Net Fixings
K
into Upright Posts and Crossbar.
DO NOT THROW AWAY
LOCKING PINS
FB
FB
X
C
H
C O R N E R
BRACKET
C O R N E R
BRACKET
H
A
C O R N E R
BRACKET
SPIGOT
B
I
L
O
X
STEP 12
Join top tubes
P
to elbows
F
and back tubes
Q
and connect to the goalpost
STEP 13
Attach Ground Anchors
see details of use overleaf..
STEP 14
Attach The Net to the
Net Fixings. Start with
each corner
TIE A CORD BETWEEN THE
TOP SUPPORT TUBES TO
SUPPORT THE ROOF OF THE
NET (THIS CAN BE LEFT TIED
IN POSITION WHEN
DISMANTLED)
FOR EASIER ASSEMBLY
Use a rubber mallet and also spray furniture polish inside posts. Do not use a metal hammer. Do not apply grease or vaseline.
WORLDWIDE © COPYRIGHT 2001 ITSA GOAL POSTS LTS, ALL RIGHTS RESERVED A REGISTERED DESIGN
A
L
H
I
A
H
C
P
F
Q
OPTIONAL - Net ties are ideal
to fit nets tightly to the side
ground frames and stanchions.
This is ideally when nets are
left attached to the fully
assembled side frames.
FOR A FAST START
- Lift the goal into postilion
and unfold the side frames, click
the back bar in, insert ground
anchors and you’re ready
to start the game.
STORAGE
The goal can be
folded flat for
easier storage
after games.
STEP 1
Lay out POSTS and
Components shown on page 1
CROSSBAR &
BACKBAR
2422 mm
SIDEBARS
1360 mm
UPRIGHTS
TOP
STANCHION
400 mm
BACK
STANCHION
1896 mm
L M
N
O
P
Q
A
M
G