Ensure locking pin is inserted
fully in the posts
3
Push locking pin down
centre of Arrow Head
2
Insert Arrow Head
into holes on posts
1
F
Q
PLASTIC
BUTTON
P
A
J
a
b
a
b
I
M
SQUARE MESH Net is cut to shape.
Simply throw over the frame and fit
each end onto top stanchion by
securing on each corner of crossbar.
NOTE: If your net does not fit the first
time, you may be fitting it to the goal
frame upside down i.e. that is to say the
net from the crossbar to the floor (a) is
longer than the length of the net to the
bottom of the upright.(b)
LONGER GROUND PEGS ARE AVAILABLE SEPARATELY.
200mm
STANDARD
300mm
SOFTER GROUND
Longer pegs are to be used on sandy or
Soft ground earth. A risk assessment of soil
conditions suitability should be carried out when
anchors are to be used.
OPTIONAL - STANCHION TIES
FIT NETS TO ARROWHEAD FIXINGS
FIT NETS TO GROUND FRAME FIXINGS
OPTIONAL - NET TIES
I
ANCHORING YOUR GOAL ON GRASS - POSITION YOUR GOAL ON A LEVEL PLAYING SURFACE.
PLACE THE MULTI-SURFACE ANCHOR OVER EACH SIDE OF THE GROUND FRAME (POSITIONS
SHOWN) HAMMER THE PEGS THROUGH THE HOLES ON THE ANCHOR DOWN UNDER THE
FRAME INTO THE GRASS. ADDITIONAL ANCHORS OR LARGER PEGS CAN BE PURCHASED FOR
USE ON SOFT GROUND OR SAND. ANCHORS WITH EXTRA BOLTS CAN BE USED FOR HARD
SURFACES SUCH AS TARMAC. COUNTER BALANCE WEIGHTS CAN ALSO BE USED (SUPPLIED
SEPARATELY).
OPTIONAL - small stanchion net ties
and larger net ties are ideal to fit nets
tightly to the side ground frames and
stanchions. This is ideally when nets are
left attached to the fully assembled side
frames.
BEFORE YOU START TO
ASSEMBLE YOUR GOAL
PREPARE THESE FIRST.
CORNER BRACKETS
Push and Lock the
Spigots to four of the six
Corner Brackets.
Push and Lock the
Blanking Caps to the two
remaining Corner
Brackets. (already
inserted)
Note: small flange bushes are already inserted
to create tight fitting bolts.
NOTE - The Plastic button on the
stanchion elbow is designed to
be tight fitting, push in and out
to warm up and make pliable.
This makes it easier to insert and
lock to part Q. Once connected
this part stays in place.
permanently.
1
K
CORNER BRACKET,
STANCHION &
ELBOW ASSEMBLY
NOTE: Ensure Top
Stanchion holes
are aligned with the
Stanchion Elbow.
GROUND FRAME NET FIXING
ARROW HEAD NET FIXING
Ensure locking
pin is inserted
fully
DO NOT THROW THE LOCKING PINS AWAY
DO NOT THROW THE LOCKING PINS AWAY
3
Push locking
pin down
centre
2
Insert ground frame
net fixings into holes
on ground frame
1
REMOVABLE NET TIES
- OPTIONAL
SMALLER STANCHION NET TIES
1
TEETH
3
2
NET CORD
4
6
7
8
Ensure the teeth of the Net tie are facing
you (see step
1
).
Loop the Net Tie around the Net Cord and
slide the end into the horizontal slot and
pull tight onto Net Cord (see step
1- 2
).
The vertical slot of the
Net Tie is used to
secure the net to the
post. Loop the Net Tie
around the post and
insert through
vertical slot and twist to
lock. (steps
3 - 5
).
Any excess Net Tie can
looped back into the
vertical slot. This will
also secure the net tie
in a fixed position
(steps
6 - 8
). If Net Ties
are to be removed after
use then do not loop
back into vertical slot.
5
POST SECTION
PULL
TIGHT
ENSURE THAT YOU TIGHTEN THE NET
TIE AROUND THE NET-CORD
(no more than 340mm apart)
Smaller net ties are ideal to attach nets to the side frames and the back net support
tubes. These are useful when you leave your nets attached to the goals at all times
as shown on the diagram to the left. (Diagram A).
The goal net can be left
attached to the pre-assembled
goal post side frames. After games
detach crossbar and back bar for
storage. We advise fitting the optional net
ties to the side frames and stanchions.
ASSEMBLY & DISASSEMBLY
FASTER
MATCH DAY
WORLDWIDE © COPYRIGHT 2016 ITSA GOAL POSTS LTD,
ALL RIGHTS RESERVED A REGISTERED DESIGN
X
A
SPARE PARTS
On back frame fix all the same way with
opening facing inwards.
On side frames along the ground fit
alternate.
FACE FORWARD
N
BACKBAR
Insert rod
slightly lower
than level
FIXING POSITIONS
SIEBARS
ALTERNATE
O
On back frame fix all the same way with opening facing
inwards. On side frames along the ground fit alternate.
TEL:
0114 24 34 200
Lugs
gap
Push ground frame
fixing in then take
back out ... check for
burrs underneath and
then carefully trim off
with a knife to enable
the base to sit flush
onto the tube .Push
pin into fixing to lock
in place.
To remove the fixing
knock the pin all the
way out and the
fixing will be released
(Diagram A)
GROUND
FRAME
WASHER
DRILL HOLES
2 x MULTI SURFACE
ANCHORS
M10 SLEEVE
ANCHOR
RAWBOLT
12cm(min)
30cm
12.3cm
18cm
12cm
(minimum)
30cm
12.3cm
18cm
THIS METHOD SECURELY ANCHORS
YOUR GOAL DOWN ON TARMAC
DO NOT OVER TIGHTEN BOLT.
CONCRETE BLOCK
(FOR USE ON
TARMAC)
USE THE HOOK ON THE END
OF THE RED GROUND PEG
TO REMOVE PEGS FROM THE GROUND OR USE
A CLAW HAMMER FOR PEGS THAT ARE
DIFFICULT TO REMOVE.
GROUND
PEG REMOVAL
D
E
The roof edges should be placed on the
top stanchions of the
goal frame.
To help define the roof of the
net. Tie the cord to one side
and pull the net chord tight and
wrap neatly down and around
the stanchion section.
NET
CHORD
If you are regularly attaching or
detaching the net then apply
colored tape to the roof cor ners
of net to help identif y the roof
area.