background image

Ensure locking pin is inserted
fully in the posts

Push locking pin down 
centre of Arrow Head

2

Insert Arrow Head
into holes on posts

F

Q

PLASTIC

BUTTON

P

A

J

a

b

a

b

I

M

 

SQUARE MESH  Net is cut to shape. 

Simply throw over the frame and fit 
each end onto top stanchion by 
securing on each corner of crossbar. 
NOTE: If your net does not fit the first 
time, you may be  fitting it to the goal 
frame upside down i.e. that is to say the 
net from the crossbar to the floor (a) is 
longer than the length of the net to the 
bottom of the upright.(b)

LONGER GROUND PEGS ARE AVAILABLE SEPARATELY. 

 200mm

  STANDARD 

 300mm

  SOFTER GROUND 

Longer pegs are to be used on sandy or 
Soft ground earth. A risk assessment of soil 
conditions suitability should be carried out when 
anchors are to be used. 

 OPTIONAL - STANCHION TIES

 FIT NETS TO ARROWHEAD FIXINGS

 FIT NETS TO GROUND FRAME FIXINGS

 OPTIONAL - NET TIES

I

ANCHORING YOUR GOAL ON GRASS - POSITION YOUR GOAL ON A LEVEL PLAYING SURFACE. 
PLACE THE MULTI-SURFACE ANCHOR OVER EACH SIDE OF THE GROUND FRAME (POSITIONS 
SHOWN) HAMMER THE PEGS THROUGH THE HOLES ON THE  ANCHOR DOWN UNDER THE 
FRAME INTO THE GRASS. ADDITIONAL ANCHORS OR LARGER PEGS CAN BE PURCHASED FOR 
USE ON SOFT GROUND OR SAND.  ANCHORS WITH EXTRA BOLTS CAN BE USED FOR HARD 
SURFACES SUCH AS TARMAC. COUNTER BALANCE WEIGHTS CAN ALSO BE USED (SUPPLIED 
SEPARATELY).

 OPTIONAL - small stanchion net ties 

and larger net ties are ideal to fit nets 
tightly to the side ground frames and 
stanchions. This is ideally when nets are 
left attached to the fully assembled side 
frames. 

BEFORE YOU START TO
ASSEMBLE YOUR GOAL
PREPARE THESE FIRST. 

  CORNER BRACKETS 

Push and Lock the 

Spigots to four of the six 

Corner Brackets.  

Push and Lock the 
Blanking Caps to the two 
remaining Corner 
Brackets. (already 
inserted) 

Note: small flange bushes are already inserted 
to create tight fitting bolts.

NOTE - The Plastic button on the 
stanchion elbow is designed to 
be tight fitting,  push in and out 
to warm up and make pliable. 
This makes it easier to insert and 
lock to part Q. Once connected 
this part stays in place. 
permanently.

 

K

CORNER BRACKET, 
STANCHION & 
ELBOW ASSEMBLY

NOTE: Ensure Top
Stanchion holes 
are aligned with the 
Stanchion Elbow.

GROUND FRAME NET FIXING

ARROW HEAD NET FIXING

Ensure locking
pin is inserted
fully 

DO NOT THROW THE LOCKING PINS AWAY 

DO NOT THROW THE LOCKING PINS AWAY 

Push locking 
pin down
centre 

2

Insert ground frame
net fixings into holes
on ground frame

1

REMOVABLE NET TIES 

- OPTIONAL

SMALLER STANCHION NET TIES

 1

TEETH

 3

 2

NET CORD

 4

 6

 7

 8

Ensure the teeth of the Net tie are facing 
you (see step 

1

). 

Loop the Net Tie around the Net Cord and 
slide the end into the horizontal slot and 
pull tight onto Net Cord (see step 

1- 2

). 

The vertical slot of the 
Net Tie is used to 
secure the net to the 
post. Loop the Net Tie 
around the post and 
insert through 
vertical slot and twist to 
lock. (steps 

3 - 5

).

Any excess Net Tie can 
looped back into the 
vertical slot. This will 
also secure the net tie 
in a fixed position 
(steps 

6 - 8

). If Net Ties 

are to be removed after 
use then do not loop 
back into vertical slot.

 5

POST SECTION

PULL

TIGHT

ENSURE THAT YOU TIGHTEN THE NET 
TIE AROUND THE NET-CORD 
(no more than 340mm apart)

Smaller net ties are ideal to attach nets to the side frames and the back net support 

tubes. These are useful when you leave your nets attached to the goals at all times 

as shown on the diagram to the left. (Diagram  A).

The goal net can be left
attached to the pre-assembled
goal post side frames. After games 
detach crossbar and back bar for
storage. We advise fitting the optional net
ties to the side frames and stanchions.

ASSEMBLY & DISASSEMBLY

FASTER

MATCH DAY

WORLDWIDE © COPYRIGHT 2016 ITSA GOAL POSTS LTD, 

ALL RIGHTS RESERVED A REGISTERED DESIGN

X

A

SPARE PARTS 

On back frame fix all the same way with 
opening facing inwards.
On side frames along the ground fit 
alternate.

FACE FORWARD

N

BACKBAR

Insert rod
slightly lower
than level

FIXING POSITIONS

SIEBARS

ALTERNATE

O

On back frame fix all the same way with opening facing
inwards. On side frames along the ground fit alternate.

TEL: 

0114 24 34 200

Lugs

gap

Push ground frame 
fixing in then take 
back out ... check for 
burrs underneath and 
then carefully trim off 
with a knife to enable 
the base to sit flush 
onto the tube  .Push 
pin into fixing to lock 
in place.

To remove the fixing 
knock the pin all the 
way out and the 
fixing will be released

(Diagram  A)

GROUND
FRAME

WASHER

DRILL HOLES

2 x MULTI SURFACE
ANCHORS

M10 SLEEVE
ANCHOR
RAWBOLT

12cm(min)

30cm

12.3cm

18cm

12cm

(minimum)

30cm

12.3cm

18cm

THIS METHOD SECURELY ANCHORS
YOUR GOAL DOWN ON TARMAC

DO NOT OVER TIGHTEN BOLT.

CONCRETE BLOCK 

(FOR USE ON

TARMAC)

USE THE HOOK ON THE END 
OF THE RED GROUND PEG
TO REMOVE PEGS FROM THE GROUND OR USE
A CLAW HAMMER FOR PEGS THAT ARE
DIFFICULT TO REMOVE.

GROUND 
PEG REMOVAL

D

E

The roof edges should be placed on the 

top stanchions of the 

goal frame.  

To help define the roof of the 
net. Tie the cord  to one side 
and pull the net chord tight and 
wrap neatly down and around 
the stanchion section.

NET 

CHORD

If you are regularly attaching or 

detaching the net then apply 

colored tape to the roof cor ners 

of net to help identif y the roof 

area.

Отзывы: