ITRON RB 4600 Скачать руководство пользователя страница 6

6

Installation

• 

Check that the maximum inlet pressure is not

higher than the design pressure of the regulator.

• 

Regulator should be lifted only with belts around

the body.

• 

Arrange enough room for the serving of the 

regulator.

Before installing the pressure regulator in the
piping, the following must be checked:

• 

the upstream and downstream flanges must be 

parallel so as to install the regulator without 
undue stress.

• 

the upstream piping must be cleaned from all 

impurities (sand, welding slag, etc.)

• 

the pressure regulator must not be visibly 

damaged.

• 

the inlet and outlet chambers of the pressure

regulator must be perfectly clean.

Make  sure  that  the  direction  of  gas  flow  corre-
sponds  to  the  arrow  on  the  pressure  regulator
body.

When  tightening  the  flange  bolts,  the  following
maximum torque - applicable to Class 5.6 bolts -
should not be exceeded:

For ease of operation, we recommend performing
installation with the valve body in horizontal align-
ment, with actuator upwards. 

Installation with actuator downwards or vertical in-
stallation are also possible.

Fig 3 gives a typical example of installation:

• 

The downstream vent valve eases start-up and
changes in pressure setting

• 

The creep relief valve - optional -limits pressure

surges (example: gas thermal expansion in case

of downstream piping exposed to sun radiation

at zero flow).

Outlet buffer volume

In case of fast variations of gas demand (ON/OFF),
the  response  time  of  the  regulator  may  cause
transient pressure surges or drops that may trig-
ger  the  overpressure  or  under-pressure  protec-
tion devices. These pressure changes can be limit-
ed to acceptable values by providing for a enough
downstream piping volume.

Sensing line

The sensing line must be connected to a section
reasonably free from turbulences, preferably in a
straight  section  of  the  downstream  piping  as
shown  in  Fig  3.  Outlet  pipe  dimensions  shall  be
such that the gas velocity at pressure sensing tap
does not exceed those given below:

• 

Outlet pressure < 200 mbar

15 to 20 m/s

• 

Outlet pressure > 200 mbar

20 to 40 m/s

M12

M14

M16

M20

35 Nm

55 Nm

85 Nm

170 Nm

3400992805  20.07.2009  13:52 Uhr  Seite 7

Содержание RB 4600

Страница 1: ...Gas Pressure Regulator RB 4600 3400992805 AA Instruction Manual w w w i t r o n c o m...

Страница 2: ...manufacturer The used fluids are classified in group 1 according article 13 Applied conformity assessment procedures PED Module D1 Applied standards and technical specification DIN EN 334 2005 A1 200...

Страница 3: ...fety Shutoff Valve Series 8500 or Instruction Manual 3850992803 Safety Shutoff Valve Series 8600 Technical features Allowable pressure PS 25 bar Inlet pressure pumax 19 bar Outlet pressure range wh 5...

Страница 4: ...4 INLET PRESSURE OUTLET PRESSURE MOTORIZATION PRESSURE MONITOR MOTORIZATION PRESSURE ACTIVE FEEDING PRESSURE TF 511 Pilot TF 511 Pilot SSV 8500 Fig 2 RB 4600 sectional view...

Страница 5: ...20 68 TF 51 1 20565127 3 5 35 50 6 40 140 TF 51 1 20565128 4 35 50 6 80 280 TF 512 20565128 4 35 50 6 6 0 1 0 TF 512 20565129 4 5 35 50 6 0 2 1 0 TF 513 20565132 3 5 35 60 6 5 0 3 1 3 TF 513 20565133...

Страница 6: ...l align ment with actuator upwards Installation with actuator downwards or vertical in stallation are also possible Fig 3 gives a typical example of installation The downstream vent valve eases start...

Страница 7: ...7 Fig 4 Typical installation RB 4700 active regulator monitor regulator and SSV 8600 shutoff valve RB 4600 operates such as illustrated but inside of one common body...

Страница 8: ...Fig 5 Installation with safety systems SSV The SSV must have a dedicated sensing line whose point of sensing provides a representative pressure An isolating valve on the sensing line is not permitted...

Страница 9: ...ompletely then slowly open the downstream on off valve until the piping is completely filled At this point the pressure regulator is operative Monitor Start up The same procedure must be followed when...

Страница 10: ...orming any maintenance operation on pressure regulators fitted with overpressure and underpressure shutoff devices open the bypass between the inlet and outlet chambers see In struction Manuals for sa...

Страница 11: ...panner Ref B Box spanner Recommended tools 2 35 3 14 24 14 24 35 14 35 14 35 4 48 48 48 48 31 1 5 24 24 314 319 333 340 6 1 7 51 1 7 29 51 51 51 8 1 7 29 1 7 29 13 13 13 13 13 30 9 326 10 13 1 1 20 40...

Страница 12: ...BR 1042 06 16 RB 4600 e Copyright 2002 Actaris All Rights Reserved 2011 medialogik Itron GmbH Hardeckstra e 2 76185 Karlsruhe Tel 49 721 5981 0 Fax 49 721 5981 189...

Отзывы: