Electrical installation
Page 111
DANGER!
For safety reasons, all of the PE earth (ground) conductors must be connected prior to the initial operation of
the system.
The EN 61800-5-1 regulations concerning protective earthing (grounding) must be complied with during the
installation!
8.14.5
Operation with long motor cables
In applications involving long motor cables and/or in the case of unsuitable motor cables with a non-permissible high cable
capacity, the filters may be thermally overloaded. To avoid these problems, we strongly recommend the following procedure
for applications requiring long motor cables:
In the case of a cable length of more than 50 m, use only cables with less than 150 pF/m (capacitance per unit length)
between the motor phase and shield!
(Please contact the motor cable supplier, if necessary.)
In the case of a cable length of more than 50 m, the frequency of the power output stage must be reduced.
Содержание C 3-Series
Страница 12: ...Page 12 Figure 33 Servo positioning controller with an integrated technology module 160 ...
Страница 70: ...Mechanical installation Page 70 Figure 8 item Servo Positioning Controller C 3 Series installation space ...
Страница 71: ...Mechanical installation Page 71 7 2 Device view Figure 9 item Servo Positioning Controller C 3 10 front view ...
Страница 76: ...Electrical installation Page 76 Figure 14 Complete set up of the item C 3 Series with a motor and PC ...