Setting Up Summary
(1) Startup and network association
Note: when successfully joined, we strongly suggest you to allow 1 minute performing self
calibration on the meter before it is ready to take load. This is particular important for correct
reading.
(2) Pair the device with other device where applicable (i.e. bind it with a ZigBee switch
for wireless control).
(3) When it is bind with a controlling device it is then ready to be used.
(4) Power/current consumption monitoring
S
tep 1.
Startup and Network Association
Setting up the SGZ805A and network
To allow SGZ805A to function, it must first join to a ZigBee network. When it is given
powered it will automatically start searching for an existed network. So before you give
power to SGZ805A make sure it is within the wireless coverage distance (~150 meters or
less) and make sure
first
you have the
permit-join feature enabled
either on a
coordinator or a router device in the network so that SGZ805A will join to the network
through it; then give power to SGZ805A and it will join into the network by itself.
*
On how to enable permit-join please refer to the router or coordinator device user manual
Operation:
Step 1: Make sure you have open up permit-join function (valid for 60 seconds) of a
coordinator or a router
Step 2: Now wire the AC cable of SGZ805A to the AC source to power it up. SGZ805A device
will start to search for the network within reach.
Step 3: When the device found the network, the LED indicator on the SGZ805A will
flash. A non-flashing solid light indicates successful join otherwise the indicator stays dark.
How to wire the device
Please go to
Power Cable Installation
section.