3
3-1
V8.5e Rev 2.1.2001
INSTALLATION
3.1 UNPACKING
Although shipments are thoroughly checked for completeness by
The Imaging Systems Group Inc., confirm that your plotter has the
following:
1. Power cord
2. Sample Roll of paper
3. Two spindle hubs
4. Rackmount spacers
Confirm that any specified options are present, such as a data cable
or fan-fold guide.
AC Power
Cord
Manual &
Warranty Card
Head Cleaning Pen
Plotter
Rail
Spacers
Spindle with Spacer disks
Thumb
Screw
Kit