background image

 

 

MEASUREMENT AND ASSEMBLY MANUAL 

Validity of  the manual: 1. 8. 2016 

EXTERIOR BLINDS TITAN 90 

1. MEASUREMENT   

Measure the width (SZ) and height (VZ) of the blind. 

Measure the width (SZ) of the blind at least at 3 points, on the top, in the middle and on the bottom. 

Use the lowest measured value for ordering and production of the blind. 

ATTENTION! Produced width (SV) of the blind TITAN is always shorter compared to measured one according to 
chosen assembly option. See: Assembly options. 

 

 Measure the height of the blind (VZ) at 3 points as well, on both sides of lining and in the middle. Use the lowest 
measured value for ordering and production of the blind. 

ATTENTION! Produced height of the blind TITAN (VV) is always 20 mm shorter compared to the measured one 
(VZ). The reason is ensuring manipulation space for assembly process and space for fixing brackets for front 
cover of the blind.  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Note: 

Real width of produced blind (SV) is always shorter compared to the one in order form. Width difference comes from the 
chosen assembly option. For assembly onto lining it is obligatory to use 2 mm distance pads (D). The pads help to adjust 
vertical level of guiding rails. Real height of produced blind  (VV) is always 20 mm shorter than the one in order form. The 
reason is ensuring manipulation space for assembly process and space for fixing brackets for front cover of the blind.  

Содержание TITAN 90

Страница 1: ...the lowest measured value for ordering and production of the blind ATTENTION Produced height of the blind TITAN VV is always 20 mm shorter compared to the measured one VZ The reason is ensuring manip...

Страница 2: ...during measurement you will avoid possible problems during later assembly of the blind Installation into reveal A min 65 mm Spacing pad Assembly holes for guiding rails Blind height including assembly...

Страница 3: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 1 8 2016 3 VZ Blind height PP Number of punching T Upper punching position RP Distance between holes 2 ASSEMBLY...

Страница 4: ...t coupling 2 pc 130 Head rail bracket x pc according to the blind width 400 450 Extension of front cover holder x pc according to the blind width 460 Screw M5x8 x pc according to the blind width 470 P...

Страница 5: ...ht of screw head max 4 mm Fixing parts have to be enough strong and suitable for particular reveal 2 3 INSTALLATION TOLERANCE Parallelism of the guiding rails in all directions 1 mm Deviation from the...

Страница 6: ...u have not misplaced right and left rail B Screw the screws through the guiding rail C Before tightening put the distance pad on the screw between lining and the rail D Tighten the screws and check th...

Страница 7: ...connection A Connect four square shafts together with the connectors B Ensure the gap between the shafts is approximately 5 mm C Tighten the connectors 2 5 7 Engine connection A First equip the engine...

Страница 8: ...of lintel or front cover stop the slats movement B Movement up is still possible for eventual setting C By moving the slats downwards the upper end limit is saved ATTENTION Do not change the lower end...

Страница 9: ...onnect more than one engine with single control unit Functionality check A Using the mounting cable move the blind several times up and down B Check horizontal free motion of the slat side clips towar...

Отзывы: