background image

 

 

 

AVS-1210 

I.R.T. Communications Pty Ltd | www.irtcommunications.com 

 

 

 

Revision 06 

 

Local control:

 

The AVS-1210 is manufactured as a slave format switcher with no local control panel. 
Two  local  control  panels  are  available;  the  CPS-1210  and  the  CPS-1220  with  10  and  20  buttons  respectively.  A 
switcher fitted with the CPS-1210 may be upgraded to 20 buttons by conversion kit CPS-1215. 
 

CPS-1210 fitting: (10 buttons) 

1.

 

Disconnect IEC power input plug from chassis and remove chassis from rack. 

 
2.

 

Remove 6 screws holding top cover (1 each side and 4 in top). Remove top cover. 
Remove 6 screws holding front escutcheon to front chassis and remove escutcheon. 
 

3.

 

Separate the switch PCB from the switch logic PCB and mount the switch PCB in the chassis cutout using the 6 
screws and stand-offs provided. The PCB should be mounted so that the LED's in the switches are at the top. 
Re-fit the switch logic PCB to the switch PCB by locating PL 1 & PL 2 over the two sets of connector pins and 
pressing firmly and evenly into place. 

 
4.

 

PL 4 on the control panel is then connected to PL4 on the rear of the switcher. 
PL  5  on  the  control  panel  is  then  connected  to  PL4  on  the  switcher  PCB  using  the  150  mm  cable  provided 
(GDW-3010). 
The connection from PL 5 on the switcher PCB to PL 5 on the rear of the switcher is left untouched. 

 
5.

 

Check the position of links LK 2 & LK 3 on the switch logic PCB. 
For switches to operate 1 - 10 LK 2 should be OUT. 
For switch panel to operate as tally only LK 3 should be in position A. 
For front panel switches to be operative LK 3 should be in position B. 
 

6.

 

Fit new front escutcheon using the original 6 screws. 
Re-fit chassis top cover using the original 6 screws. The two countersunk head screws are used at the front top 
of the cover. Note that the top cover sits on top of the chassis at the rear, but under the fold at the front. 

 
7.

 

The switcher is now ready to re-install in the rack. 

 

CPS-1220 fitting: (20 buttons) 

The procedure is the same as for the CPS-1210 except that two sets of switch PCB's are fitted. 

 
Normal 20 x 1 operation.

 

1.

 

As per CPS-1210. 

2.

 

As per CPS-1210. 

3.

 

As per CPS-1210. Repeat for the second PCB. 

4.

 

PL 4 on the 11 - 20 switch control panel is then connected to PL 4 on the rear of the switcher. 
PL 5 on the 11 - 20 switch control panel is then connected to PL 4 on the 1 - 10 switch control panel using the 
300 mm cable provided (GDW-3011). 
PL  5  on  the  1  -  10  switcher  control  panel  is  then  connected  to  PL  4  on  the  switcher  PCB  using  the  150  mm 
cable provided (GDW-3010). 
The connection from PL 5 on the switcher PCB to PL 5 on the rear of the switcher is left untouched. 

5.

 

Check the position of links LK 2 & LK 3 on the switch logic PCB's. 
For the 1 - 10 switch PCB LK 2 should be OUT. 
For the 11 - 20 switch PCB LK 2 should be IN. 
For switch panel to operate as tally only LK 3 should be in position A on both PCB's. 
For front panel switches to be operative LK 3 should be in position B on both PCB's. 

6.

 

As per CPS-1210. 

7.

 

As per CPS-1210. 

 
See also 20 x 1 operation section below for changes to main PCB link settings. 

Содержание AVS-1210

Страница 1: ...AVS 1210 I R T Communications Pty Ltd www irtcommunications com Revision 06 User Manual 10 x 1 Video Switcher...

Страница 2: ...400 10x1 switchers manuals S N 9910000 02 06 12 1999 AJP Front and rear panel diagrams added S N 9910000 03 07 03 1997 AJP Warning note on PL 4 to PL 5 connection added S N 9910000 04 12 09 2001 SH IR...

Страница 3: ...l Description 7 Internal adjustments 9 Configuration 9 Wire per crosspoint control 10 Tally outputs 11 Audio breakaway 12 Configuration examples 13 Configurations for up to 200 x 1 14 Installation 15...

Страница 4: ...ons dangerous potentials may exist in some circuits when power controls are in the OFF position Maintenance personnel should observe all safety regulations Do not make any adjustments inside equipment...

Страница 5: ...ral switchers to be stacked with common inputs without the need for additional distribution amplifiers The switcher is housed in an IRT one rack unit 44 mm high 483 mm 19 inch rack mounting metal chas...

Страница 6: ...rval Timing is derived from the output video Type 4 5 bit parallel TTL level signal compatible with IRT VA 400 video switcher tally output circuit and IRT 3000 series switchers Number 1 input 1 output...

Страница 7: ...ff isolation in the disabled state and fully buffered unilateral signal path Make before break switching assures virtually glitch free switching For use in N x M routing matrices the GX4314 features v...

Страница 8: ...h in Unlatch out The 5 bit codes on Pins 2A to 4A represent the input selected This code is in BCD Binary Coded Decimal where the Data 0 to 3 represent the binary numbers 0 to 9 Inputs 1 to 10 if Data...

Страница 9: ...ntrol panels under Installation PL 4 on the control panel is then connected to PL4 on the rear of the switcher PL 5 on the control panel is then connected to the switcher PCB 20 x 1 operation A link i...

Страница 10: ...quired it is not possible to operate the switcher in 20 x 1 wire per crosspoint mode and retain the standard BCD remote control For 20 x 1 operation it is necessary to wire connections from the back o...

Страница 11: ...W 10 10 6A 5 Vdc 11 6B 12 7A No connection 7B 8A 8B 20 x 1 Operation Due to the number of connections required it is not possible to operate the switcher in 20 x 1 wire per crosspoint mode and retain...

Страница 12: ...This option is available either by using two interconnected CPS 1050 10 button remote control panels one CPS 1052 20 button remote control panel or one AVS 1210 10 x 1 video switcher fitted with a CP...

Страница 13: ...4 10 way ribbon cable to D25 male CPS 1052 20 button remote control panel Optional additional panels 25 way ribbon cable male D to male D 25 way ribbon cable male D to male D 25 way ribbon cable male...

Страница 14: ...ections for video and audio signal wiring between the input switchers and the bank control switcher are required Please consult IRT for details of connections before proceeding See also Configuration...

Страница 15: ...wer AC mains supply Ensure that operating voltage of unit and local supply voltage match and that correct rating fuse is installed for local supply DC supply Ensure that the correct polarity is observ...

Страница 16: ...e OUT For switch panel to operate as tally only LK 3 should be in position A For front panel switches to be operative LK 3 should be in position B 6 Fit new front escutcheon using the original 6 screw...

Страница 17: ...r the 11 20 switch PCB LK 2 should be OUT For switch panel to operate as tally only LK 3 should be in position A on both PCB s For front panel switches to be operative LK 3 should be in position B on...

Страница 18: ...pin D sockets on the rear panel The connections to PL 4 PL 5 are 1 14 12 Vdc for remote control panel PL 4 only 2 15 Gnd 3 16 Switch pulse 4 17 5 18 D Data 3 6 19 C Data 2 7 20 B Data 1 8 21 A Data 0...

Страница 19: ...l and either the AAS 1220 or AVS 1210 The two switchers are then linked with a 25 way cable wired pin to pin Note that he connection must always be from PL 5 on the remote control panel to PL 4 on the...

Страница 20: ...tion 20 x 1 operation For 20 x 1 operation LK 2 should be installed For normal operation it must not be installed While LK 2 is installed the switcher will respond to commands for crosspoints 11 20 as...

Страница 21: ...itted with CPS 1210 front view CPS 1210 view of rear from inside chassis AVS 1210 fitted with CPS 1220 front view CPS 1220 view of rear from inside chassis CPS 1210 view of rear from inside chassis co...

Страница 22: ...nty on components shall be extended by IRT only to the extent obtainable from the component supplier Equipment return Before arranging service ensure that the fault is in the unit to be serviced and n...

Отзывы: