background image

Diagrams of Athena Vertical

Pipe Centres

Fix Brackets

3

PLEASE NOTE:

It is essential that all brackets are 

level to ensure a vertical alignment for 

connecting the pipework.

Hang Radiator & Commission

4

Please Note: 

In accordance with Part L1 2006 of the Building Regulations 

and BS7593:1992 code of practice for the treatment of hot 

water and central heating systems, we strongly recommend 

flushing the heating system post installation of new radiators 

and then adding the correct quantity and type of inhibitor 

for use with your radiator and system to prevent corrosion. 

Damage caused to systems not protected by a suitable 

inhibitor will not be covered by manufacturer’s guarantee. 

Unpack & Inspect

1

You should have:
•   1 Radiator

•  4 Wall bracket Nipples 

•  4 Wall brackets Sleeves 

•  4 Grub Screws

•  1 Airvent 

•  1 Blanking Plug  

You will need:
•  Tape measure

•  Electric drill 

•  Suitable drill bit and plugs

•  Spirit level

Contents

2

The Radiator Company prides itself on selecting products 

from manufacturers who exercise tight quality control 

measures.  

 

We only select models with excellent standards of welding 

and brazing, as well as high quality finishes. 

All of our products are well packaged and should reach 

you in perfect condition. Just in case however, we offer a 

minimum 5-year no quibble guarantee for all radiators and 

towel rails.

The Radiator Company must be notified of any shortages or 

damage within 28 days of delivery.  

 

For further information please see 

terms and conditions on back page.

Pipe centres left to right

width minus 70mm

Pipe centres from wall 

45mm to 53mm

Depth from wall

67mm to 75mm

1.

  Insert bracket nipples into threaded holes on the back of  

  the radiator. 

2. 

 The fixing positions for the two top brackets are measured

  down 77.5mm from the top of the radiator and 35mm in  
  from the edge of the radiator. Mark the positions on the  
  wall and hold up your radiator to check the positions. 

3.

  Ensure the markings are level, and using a suitable drill bit  

  and plugs, fix the top two bracket sleeves to the wall. 

4.

  For accuracy, we suggest hanging the radiator on the top  

  two brackets, then marking the bottom bracket positions. 

5.

  Remove the radiator off the wall and fix the bottom two  

  brackets to the wall. 

6.

 Hold up the radiator to the wall and slot the four bracket  

  nipples into the bracket sleeves.

7. 

Use the provided grub screws to secure the radiator by  

  inserting and tightening on the side of the brackets. 

35

77.5

Bracket Positions

67-75

45-53

77.5

35

77.5

35

77.5

35

Отзывы: