1.Front and Rear Stabilizer Installation
1.1 Front Stabilizer Installation.
Lift up the Main Frame (D-1) from the front, and then align the Front Stabilizer (E-1) onto the front
curve of the Main Frame (D-1). Insert 2 Carriage Bolts (N-1) from the bottom, followed by 2
Flat
Washers (N-4), 2 Spring Washers (N-3) and 2 Cap Nuts (N-2). Hold the Front Stabilizer (E-1) to the Main
Frame (D-1) then tighten by using the Open Wrench (N-11) provided.
1.2 Rear Stabilizer Installation.
Repeat the above step to install the REAR stabilizer (F-1)
1.3 Adjustable Levelers
Turn the Adjustable Levelers (F-3) to the desired height and make sure the bike is stable on the
floor after the adjustment.
Proper leveling will reduce wobbling and squeaking.
Hardware:
Tool:
N-11 Open Wrench
13,15mm 1PC
ASSEMBLY
10
N-1 Carriage Bolt
M8x1.25x60L
4PCS
N-2 Cap Nut
M8x1.25x15L
4PCS
N-3 Spring Washer
D13.2x D8.2x2T
4PCS
N-4 Flat Washer
D16x D8.5x1.2T
4PCS
Содержание 6155
Страница 2: ...6155 01 100815 ...
Страница 5: ...3 LABEL PLACEMENT ...
Страница 7: ...5 OVERVIEW DRAWING ...
Страница 8: ...6 HARDWARE TOOLS LIST ...