STEP C

STEP  D

a. Mix  the  concre te  accord ing  to the instru ctions on the bags. Note that
    a  thicker  mix  of  concre te  will  dry stro nger than a thin mix. Pour the 
    concre te into the hole, stopping  appro ximately 18 inches fro m the top
    of the hole.
b. Insert  the  four  pieces  of  Anchor

 R

ebar (P) into the  hole, pushing each

    piece  firmly  to  the  botto m  of  the  hole.  The  four  pieces  should  be
    arranged in a square appro ximately 8 inches wide so that each piece of
    re bar  will  be  positioned next to the J-Bolts when the  J-Bolt  Template
    is placed in the cement.
c. Finish  filling the hole to the top with concre te. The top of the concre te 
    should re ach just above the level of the top of the form.

P

a. Positi on  the  J-Bolt  Template (O) over  the  hole  so  that  it  is centered,
     with the center 

          

line 

  

of 

  

the 

 

 

     

J-Bolt

 

 parallel

 

 with

 

 the

  

 edge

 

 of

  

 the

 

 playing

 

    

 

  

 

 

 

  

 

  

 surface

  .

 

 (

See

  

 Figure

 

 2A

 )

b.Push  the  J-Bolts  (N)  into  the  concrete   until  the   J-Bolt  Template  is 
    restin g fla t against the surface o

 

f the concrete.

c. Grasp  the  tops  of  the   J-Bolts and agita te  the Template  assembly  back
    and forth repeatedly to eliminate any air bubbles in the concrete. Lift the 
    Template  slightly  above  the  concrete  when  agita tin g .  Make  sure  the 
    Template  is  restin g  on  the  concrete  afte r  agita tin g. Form  the concrete
    into a downward slope away from the Pole to allow water runoff.
d. Clean off  any concrete that may be on the J-Bolt Template or the exposed
    portions of the J-Bolts .
e. Using  a  carpenter

s level, make sure the Template is  square to and level

    with the playing surface.
f. Allow the concrete to cure  for  a  minimum of 5-7 days  before  installing
    the  rest   of  your  basketball  system.  In  cold  ,  wet   weather  or  humid 
    climates, allow additi onal tim e for the concrete to cure. 

cente line of the

minimum

YOU ARE NOW FINISHED WITH THE INITIAL ASSEMBLY STEPS. DO NOT PRO-

CEED WITH THE ASSEMBLY UNTIL THE CONCRETE HAS FULLY CURED .  CUR-

ING WILL TAKE A MINIMUM OF 72 HOURS. IN HUMID CLIMATES OR WET

WEATHER, ALLOW ADDITIONAL TIME FOR THE CONCRETE TO CURE.

!

!

WARNING

NEVER  USE  THE  SYSTEM  WITHOUT  FOLLOWING   THE  CEMENTING   INSTRUCTIONS .  FAILURE   TO
FOLLOW ALL OF THESE INSTRUCTIONS AND WARNINGS COULD LEAD TO SERIOUS PERSONAL  INJURY
OR PROPERTY DAMAGE AS LISTED ON PAGE ONE.

O

5

A nch o r Template

FIGURE 2A

FIGURE 2B

Содержание TRIPPLE THREAT

Страница 1: ... E R S O N A L I N J U R Y FAILURE TO COMPLY MAY ALSO RESULT IN PROPERTY DAMAGE PLEASE HEED ALL WARNINGS AND CAUTIONS TO ENSURE YOUR SAFETY DO NOT ATTEMPT TO ASSEMBLE THIS S Y S T E M W I T H O U T C A R E F U L LY READING AND FOLLOWING ALL I N S T R U C T I O N S B E G I N B Y I D E N T I F Y I N G A N D T A K I N G INVENTORY OF ALL PARTS USING T H E PA R T S L I S T P R O V I D E D IRONCLAD SPOR...

Страница 2: ...TRUCTIONS FAILURE TO FOLLOW THESE SAFETY INSTRUCTIONS MAY RESULT IN SERIOUS INJURY OR PROPERTY DAMAGE AND WILL VOID THE WARRANTY The owner must ensur e that all player s know and follow these rules to saf ely oper ate the sys tem Proper and com plete assem bly use and super vision is essent ial for proper oper ation and to reduce the risk of acci dent or injury A high probabi lity of ser ious inju...

Страница 3: ...tension Arms D 1 H Frame Backboard Mount E 2 Spring Assist Cartridge F 1 Actuator Height Adjustment Device G 1 Rim Height Indicator H 1 Rim Height Sticker I 1 16mm x 13cm Hex Bolts J 1 16mm x 18cm Hex Bolts K 4 16mm Flat Washer L 2 16mm Lock Nuts M 4 Steel and Plastic Spacer N 6 18mmAnchor J Bolts O 1 Anchor Template P 6 Anchor Rebars Q 12 Thick Washers R 18 18mm J Bolt Hex Nuts S 1 18mm x 320mm H...

Страница 4: ...60 ...

Страница 5: ...mplate assembly back and forth repeatedly to eliminate any air bubbles in the concrete Lift the Template slightly above the concrete when agitating Make sure the Template is resting on the concrete after agitating Form the concrete into a downward slope away from the Pole to allow water runoff d Clean off any concrete that may be on the J Bolt Template or the exposed portions of the J Bolts e Usin...

Страница 6: ...s shown in FIGURE 1B C If the Main Post A is not exactly vertical adjust the 18mm J Bolt Hex Nuts R located under the Post base Tighten all of the Flange Nuts S when Main Post A is vertical NOTE Face the Main Post A with Actuator Bracket facing away from playing court as shown in FIGURE 1C 6 STEP2 A Slide the Main Extension Arm B over the top of the Main Post A and attach to the lower pivot tube w...

Страница 7: ......

Страница 8: ...hown A Attach the backboard to Main Extension Arm B by using a 18mm x 415mm Hex Bolt W two 18mm Flat Washers U and a 18mm Lock Nut M B Attach the 2 Upper Extension Arm C to Backboard frame be sure the longer welded tubes at the end of upper arms face to backboard frame as shown using a 18mm x 345mm Hex Bolt W two 18mm Flat Washers U and a 18mm Lock Nut V to tight the upper arms A Insert the 4 Plas...

Отзывы: