background image

NOTES

Содержание COMFORT 30

Страница 1: ...VICING INSTRUCTIONS ENSURE THAT THESE INSTRUCTIONS ARE LEFT FOR THE USER AFTER COMPLETION OF THE BENCHMARK SECTION PLEASE READ THE IMPORTANT NOTICE WITHIN THIS GUIDE REGARDING YOUR BOILER WARRANTY UK...

Страница 2: ...any surfaces carpets or floorings Use a suitable container to catch any water that escapes when removing the protective caps from the connections SAFE HANDLING IMPORTANT NOTICE For the first year all...

Страница 3: ......

Страница 4: ...standards of installation and commissioning of domestic heating and hot water systems in the UK and to encourage regular servicing to optimise safety efficiency and performance Benchmark is managed a...

Страница 5: ...ter and the correct pressure showing on the pressure gauge Is the Auto Air Vent open Has the pump been rotated manually Is the gas supply working pressure correct Is the boiler wired correctly See ins...

Страница 6: ...tured and sold by do not contain any banned materials or substances ie they comply with ISO9000 2000 1 DESCRIPTION OF THE BOILER 65 65 60 70 M U G E R M U G E R 125 15 450 60 100 139 183 50 39 30 10 6...

Страница 7: ...he heating expansion vessel bar 1 0 D H W setting range C 10 60 D H W flow rate EN 625 l min 13 4 Continuous D H W flow rate t 30 C l min 14 4 Minimum D H W flow rate l min 2 2 D H W pressure min max...

Страница 8: ...elease vent 11 D H W flow switch 12 Water inlet filter 14 Pressure relief valve 15 Water pressure switch 16 Automatic bypass 17 Drain vent 18 Expansion vessel 19 Condensate drain trap 21 D H W isolati...

Страница 9: ...ain trap 3 C H sensor SM 4 Safety thermostat 5 Ignition electrode 7 Primary exchanger 8 Air release vent 9 Limit stat 10 Exhaust temperature sensor 11 Smoke chamber 12 Expansion vessel 13 Air inlet 14...

Страница 10: ...pe should be a minimum of 15 mm and should be able to withstand boiling water any should avoid sharp corners or upward pipe runs where water may be retained Gas Connection The gas connection must be m...

Страница 11: ...ucts for the flushing and final treatment of the system water This is particularly important in hard water areas Artificially softened water must not be used to fill the heating system It is important...

Страница 12: ...external perimeter walls of the building To provide some indications of possible solutions Table 4 gives the minimum distances to be observed with reference to the type of building shown in fig 9 120...

Страница 13: ...inal is fitted within 850 mm 34 in of a plas tic or painted gutter or 450 mm 18 in of painted eaves an aluminium shield at least 1 500 mm 59 in long must be fitted to the underside of the painted surf...

Страница 14: ...s valve coil VD Divertor valve SM C H sensor TS Safety thermostat TFU Thermal fuse TL Limit stat FL D H W flow switch SF Exhaust temperature sensor PA Water pressure switch TA Room thermostat SE Exter...

Страница 15: ...re than two seconds to enter standby RESET is only available if a re settable error is signalled D H W SET Press the key to display the D H W temperature value set HEATING SET Press the key to display...

Страница 16: ...0 PAR 14 C 1 20 14 Maximum heating temperature PAR 13 80 C 1 80 15 Maximum heating power 30 99 1 99 16 Post circulation time 0 99 10 sec 1 03 17 Pump heating activation delay 0 99 10 sec 1 01 18 Re ig...

Страница 17: ...hich guarantees reaction in the case of accidental extinction or lack of gas within one second 3 6 1 Functioning cycle Burner ignition should occur within 10 seconds of the opening of the gas valve If...

Страница 18: ...100 485 200 480 300 471 400 462 500 445 600 423 700 391 800 352 900 300 1050 222 iQE COMFORT 30 Fig 15 Fig 14 KEY 1 Condensate drain trap 2 Diverter valve 3 D H W exchanger 4 Gas valve 5 D H W flow s...

Страница 19: ...this value using or Exit the parameters section by pressing The table below gives the values to set when the supply gas is changed 4 2 2 Calibrating the gas valve pressures See 4 8 1 This can only be...

Страница 20: ...maximum Hi and at minimum Lo power From that moment the boiler will start working in heating mode at maximum power with cut off at 80 C and re ignition at 70 C Before activating the chimney sweep fun...

Страница 21: ...ct combustion having first checked That the boiler has been installed in accordance with these instructions The integrity of the flue system and the flue seals The integrity of the boiler combustion c...

Страница 22: ...nnect the fan wiring Remove the four nuts securing the burner to the heat exchanger Carefully lift out the burner Check seals and replace if necessary Replace in reverse order Test for gas tightness 4...

Страница 23: ...Fitted Not required Thermostatic radiator valves Fitted Not required Automatic bypass to system Fitted Not required Boiler interlock Provided ALL SYSTEMS s instructions Yes What system cleaner was use...

Страница 24: ...in rate Where Possible CO ppm AND CO Comments Signature SERVICE 04 Date Engineer name Company name Telephone No Gas safe register No Record At max rate CO ppm AND CO At min rate Where Possible CO ppm...

Страница 25: ...leads from L to E if meter reads other than infinity there is a fault which should be isolated A detailed continuity check is required to trace the faulty component IMPORTANT These series of checks a...

Страница 26: ...obtained a flue gas analysis must be done See section 4 2 2 9 Press the button to return the boiler to minimum output Lo will be displayed 10 Check the analyzer CO2 Ratio and compare to values reporte...

Страница 27: ...ER PRESSURE SWITCH Isolate boiler Remove cover Isolate flow and return valves Drain boiler using drain vent Remove clip below the switch Disconnect the wiring Lift switch upwards Refit in reverse orde...

Страница 28: ...28 7 EXPLODED VIEWS...

Страница 29: ...29...

Страница 30: ...ring 2031 24 6278812 Air gas hose upper side 25 6226465 O ring diam 183 83x2 62 26 6174809 Gasket for ignition electrode 27 6221644 Ignition electrode 28 6221645 Ionisation electrode 29 6174816 Gasket...

Страница 31: ...42 Spring clip 89 6226640 Spring clip 90 6119357 Brass cap 91 6226641 Spring clip 92 6040215 Pressure relief valve 3 bar 93 6226472 ORing 17 86x2 62 94 6272331 Circulating pump 95 6013182 Automatic ai...

Страница 32: ...the possibility that UK weather patterns will show more extremes in future due to the effects of global climate change the following guidance updates previous recommendations on condensate drainage p...

Страница 33: ...n be removed using a proprietary condensate pump of a specification recommended by the boiler or pump manufacturer The pump outlet should discharge to a suitable internal foul water discharge point su...

Страница 34: ...ion then the connection method shown in Figure 4 should be used together with the measures on insulation etc as described above and shown in the diagram When a rain water downpipe is used as the termi...

Страница 35: ...for householders on remedial actions which can be taken if a condensate drainage pipe freezes This may result in requests for alteration to condensate drainage pipework in which case the guidance abov...

Страница 36: ...rnal soil and vent stack Key 1 Boiler 2 Visible air break 3 75 mm trap 4 Visible air break and trap not required if there is a trap with a minimum condensate seal of 75 mm incorporated into the boiler...

Страница 37: ...red if there is a trap with a minimum condensate seal of 75 mm incorporated into the boiler In this case the 100 mm is measured to the trap in the boiler 5 Sink basin bath or shower 6 Open end of cond...

Страница 38: ...isible air break at plug hole 3 75 mm sink basin bath or shower waste trap 4 Sink basin bath or shower with integral overflow 5 Open end of condensate drainage pipe direct into gully 25 mm min below g...

Страница 39: ...39 IND GUIDE INST 10 11 HHIC REF T11 0027BRev8 Figure 3 Connection of a condensate pump typical method NB manufacturer s detailed instructions should be followed...

Страница 40: ...nimum up to three storeys 2 Visible air break 8 Minimum internal diameter 19 mm 3 75 mm trap 9 Pipe size transition point 4 Visible air break and trap not required if there is a trap with a minimum co...

Страница 41: ...drain Key 1 Condensate discharge pipe from boiler 7 Air gap 2 Pipe size transition point 8 68 mm PVCu strap on fitting 3 Water weather proof insulation 9 Minimum internal diameter 19 mm 4 43 mm 90 ma...

Страница 42: ...required if there is a trap with a minimum condensate seal of 38 mm incorporated into the boiler 5 External length of pipe 3 m maximum 6 Open end of condensate drainage pipe direct into gully 25 mm m...

Страница 43: ...above or below ground level End cut at 45 3 Diameter 100 mm minimum plastic tube 4 Bottom of tube sealed 5 Limestone chippings 6 Two rows of three 12 mm holes at 25 mm centres 50 mm from bottom of tub...

Страница 44: ...to the boiler Is O2 less than or equal to 20 6 and CO2 less than 0 2 VERIFY FLUE INTEGRITY Analyser readings indicate that combustion products and inlet air must be mixing Further investigation of th...

Страница 45: ...NOTES...

Страница 46: ...NOTES...

Страница 47: ......

Страница 48: ...iqe co uk Trade House BA22 8RT Phone 0800 0152252...

Отзывы: