Product Description of BRT-112
Page 3 of 4
Shenzhen Asia Bright Industry co., Ltd., Building 10, Asia Industrial Park, Gangtou, Bantian, Shenzhen, China.
© 2015 All rights reserved. Subject to change without notices.
Fig. 4
BRT-112 Installation Guide
BRT-112 Operation Guide:
Switch on/off the load: After BRT-112 is powered on, touching the on/off buttons will turn
on or turn off the load respectively, when the delay-off function is not setup. When a load is
turned on, the button will become brighter in blue.
Fig. 5
Dip Switches for Activating Delay-off Time