Page 13
The gas supply pipe should be connected
to the gas tap (I), which is on the right next
to the wiring box on the back.
It is important to have the connections done by a qualified technician, in order to
ensure that the installation is in accordance with the prevailing standards and
instructions.
The dryer should be connected to the type of gas indicated on the serial plate.
The use
of too small gas pipes
can result in insufficient gas supply, which can lead
to slow heat-up and poor drying quality.
When the dryer is used in combination with a weighing platform, the gas supply pipe
has to be made of flexible material to allow the weighing system to keep moving
freely.
I
It is important to work with the right gas pressure (see technical remarks) in order to
obtain a good ignition, heating and consequently a good operation in general.
After the gas supply has been connected, the gas tap in the dryer should be
turned on
(clockwise).
Test all connections for possible leaks by means of a soap solution, but
never with a flame.
Gas connection
Electrical Controls Service
Caution: Label all wires prior to disconnection when servicing controls. Wiring errors can
cause improper and dangerous operation.
Verify proper operation after servicing.