Page 23
Step 3: Flare pipe ends
Proper flaring is essential to achieve an
airtight seal.
1. After removing burrs from cut pipe, seal
the ends with PVC tape to prevent foreign
materials from entering the pipe.
2.
Sheath the pipe with insulating material.
3.
Place flare nuts on both ends of pipe.
Make sure they are facing in the right
direction, because you can’t put them on
or change their direction after flaring.
See Fig. 7.6
Flare nut
Copper pipe
Fig. 7.6
4. Remove PVC tape from ends of pipe when
ready to perform flaring work.
5. Clamp flare form on the end of the pipe.
The end of the pipe must extend beyond
the flare form.
Flare form
Pipe
Fig. 7.7
6.
Place flaring tool onto the form.
7.
Turn the handle of the flaring tool
clockwise until the pipe is fully flared.
Flare the pipe in accordance with the
dimensions shown in table 7.5.
8.
Remove the flaring tool and flare form, then
inspect the end of the pipe for cracks and
even flaring.
Step 4: Connect pipes
Connect the copper pipes to the indoor unit first,
then connect it to the outdoor unit. You should
first connect the low-pressure pipe, then the high-
pressure pipe.
1.
When connecting the flare nuts, apply a thin
coat of refrigeration oil to the flared ends of
the pipes.
2.
Align the center of the two pipes that you
will connect.
Indoor unit tubing
Flare nut
Pipe
Fig. 7.9
3. Tighten the flare nut as tightly as possible by hand.
4. Using a spanner, grip the nut on the unit tubing.
5. While firmly gripping the nut, use a torque
wrench to tighten the flare nut according to
the torque values in table 7.5.
Table 7.5: PIPING EXTENSION BEYOND FLARE FORM
Pipe
gauge
Tightening
torque
Flare dimension (A)
(Unit: mm/Inch)
Flare shape
Min.
Max.
Ø 6.4
R0.4~0.8
45
°±
2
90
°
±
4
A
Fig. 7.8
Ø 9.5
Ø 12.7
Ø 15.9
Ø 19.1
Ø 22
65-67 N.m
(663-683 kgf.cm)
23.2/0.91 23.7/0.93
75-85N.m
(765-867 kgf.cm)
26.4/1.04 26.9/1.06
18-20 N.m
(183-204 kgf.cm)
8.4/0.33
8.7/0.34
25-26 N.m
(255-265 kgf.cm)
13.2/0.52 13.5/0.53
35-36 N.m
(357-367 kgf.cm)
16.2/0.64 16.5/0.65
45-47 N.m
(459-480 kgf.cm)
19.2/0.76 19.7/0.78
NOTE:
Use both a spanner and a torque wrench
when connecting or disconnecting pipes to/from
the unit.
Fig. 7.10
CAUTION
•
Ensure to wrap insulation around the piping.
Direct contact with the bare piping may result
in burns or frostbite.
•
Make sure the pipe is properly connected.
Over tightening may damage the bell mouth
and under tightening may lead to leakage.
NOTE ON MINIMUM BEND RADIUS
Carefully bend the tubing in the middle according
to the diagram below. DO NOT bend the tubing
more than 90° or more than 3 times.
Bend the pipe with thumb
min-radius 10cm (3.9”)
Fig. 7.11
6. After connecting the copper pipes to the
indoor unit, wrap the power cable, signal
cable and the piping together with binding
tape.
NOTE:
DO NOT
intertwine signal cable with
other wires. While bundling these items
together, do not intertwine or cross the signal
cable with any other wiring.
7. Thread this pipeline through the wall and
connect it to the outdoor unit.
8. Insulate all the piping, including the valves
of the outdoor unit.
9. Open the stop valves of the outdoor unit
to start the flow of the refrigerant
between the indoor and outdoor unit.
CAUTION
Check to make sure there is no refrigerant leak
after completing the installation work. If there is
a refrigerant leak, ventilate the area immediately
and evacuate the system (refer to the Air
Evacuation section of this manual).
Содержание U4MRS-12B
Страница 31: ...Page 31...
Страница 32: ...2 Indoor Unit Installation 07 1 04 08 09 13 14 14 2 05 3 07 6 15 4 07 5 12...
Страница 33: ...3 07 MC MC L N 18 20 27 28 22 23 o 25 7 18 9 27 10 29 8 20...
Страница 35: ...5 2 1 2 3 4 12 5...
Страница 36: ...6 L N 1 2 3 4 5 MC MC 6 7 3 9 27 29 22 19 15 17...
Страница 37: ...7 4 4 1 1 9 000btu h 18 000btu h 1m 3 2 1m 3 2...
Страница 41: ...11 125mm 4 92 160mm 6 3 18 60 4 1 5 6 1 2 3 1 2 3 2 3 4 11 4 12 4 15 4 16 4 13...
Страница 42: ...12 5 1 2 M10 5 1 5 2 1 1 60cm 23 6 5 1 5 2 5 3...
Страница 48: ...18 7 2 7 3 10 32 8 7 2 7 62m s 1500 fpm 6m 20ft 7 3...
Страница 53: ...23 7 10 7 11 90 3 10cm 3 9 6 7 8 9...
Страница 54: ...24 CONFIRM 3 6 ON on 4 5 1 2 FAN ONLY 2 o 3 FAN ONLY H L 4 COPY AF booster HRV 3...
Страница 57: ...27 76cmHg 9 0 1 MPa 40L min 0 1MPa 2 0 1MPa 1 2 1 2 3 4 5 15 76cmHG 1x105Pa 6 7 5 8 1 4 5 9 10 11 12 9 1 9 2...
Страница 59: ...29 1 2 3 COOL 4 d 5 6 2 000ml COOL 10...
Страница 60: ...30...
Страница 61: ...31...
Страница 91: ...Pagina 31...
Страница 92: ...Pagina 32 Scan here to download the latest version of this manual DUCT TYPE AIR CONDITIONING SYSTEMS...