Hardware Operations
2015-MNU-000023
2-1
2
Hardware Operations
This chapter describes the hardware setup procedures that you have to perform when
replacing system components. It also gives detailed information on the internal components
and how to replace them.
2.1
Before You Start
Take note of the following operations before you start to remove or install internal
components.
2.1.1
Power Off
To press the power button:
Press the power button
to toggle the server to standby. The power LED
in green turns
off.
Figure 2-1 Pressing the Power Button
The components shown in this chapter are mainly for your reference. Please take the
actual shipment as standard.
To reduce the risk of injury from electric shock, remove the power cord to completely
disconnect power from the system.
Moving the Power On/Off switch to the Off position does not completely remove power
from the system. Some portions of the power supply and some internal circuitry
remain active. Disconnect all power cords from the server to completely remove
power from the system.
Содержание N800G3
Страница 1: ...P N 2015 MNU 000023 November 2015 Revision A 1U Server System User Manual N800G3 ...
Страница 2: ......
Страница 4: ......
Страница 8: ......
Страница 20: ......
Страница 32: ......
Страница 59: ...Chapter 3 Connectors Backplane Connectors Power Distribution Board Connectors ...
Страница 60: ......
Страница 64: ......
Страница 65: ...Chapter 4 Cable Routing ...
Страница 66: ......
Страница 67: ...Cable Routing 2015 MNU 000023 4 1 4 Cable Routing ...
Страница 68: ......
Страница 69: ...China RoHS Regulations Appendix ...
Страница 70: ......
Страница 71: ...Appendix 2015 MNU 000023 I Appendix China RoHS Regulations Figure I China RoHS Regulations ...
Страница 72: ......
Страница 73: ...Board Manual B800G3 June 2015 Revision A P N 2015 MNU 000009 ...
Страница 75: ......
Страница 79: ...Conventions Safety Symbols Safety Precautions Regulatory and Integration Information About This Manual ...
Страница 80: ......
Страница 90: ......
Страница 98: ......
Страница 99: ...Before You Start Screw Holes System Battery Processor System Memory Chapter 2 Hardware Operations ...
Страница 100: ......
Страница 112: ......
Страница 132: ......
Страница 133: ...Appendix China RoHS Regulations ...
Страница 134: ......
Страница 135: ...Appendix 2015 MNU 000009 I Appendix China RoHS Regulations Appendix Figure I China RoHS Regulations ...
Страница 136: ...B800G3 BMC SPEC ...
Страница 137: ...B800G3 BMC Specification Version 0 6 BMC Design Department IIA 2015 04 20 ...
Страница 175: ...B800G3 BMC Specification 39 19 FIRMWARE UPDATE ...
Страница 179: ...B800G3 BIOS SPEC ...
Страница 180: ...04 01 2015 Inventec Corp Confidential 1 N800G3 BIOS Specification 04 01 2015 Version 1 0 ...
Страница 211: ...04 01 2015 Inventec Corp Confidential 32 Device Tagging Disable Enable Enable Disable Device Tagging ...
Страница 215: ...04 01 2015 Inventec Corp Confidential 36 4uS 8uS 8uS 16uS 16uS 32uS 32uS 64uS 64uS ...
Страница 248: ...04 01 2015 Inventec Corp Confidential 69 Network Device BBS Priorities 1 BEV Device BBS Priorities 1 ...