34
11. Maintenance
chart
Service and maintenance of the
SB755
TM
must only be performed by personnel
who have received the necessary instruction or training
S/N (located on mattress support):
___________________
Date: Initials:
Circlips, cotter pins and plastic
fixing ring checked.
Screws tightened.
Weldings checked.
Side rail locking and moving system tested.
Castor fittings tightened.
Castor brakes checked.
Height adjustment motor checked.
Backrest motor checked.
Thigh section motor checked.
Leg section motor checked.
Cables correctly suspended and undamaged.
Plugs undamaged.
Damaged coating repaired.
Line side rail straps checked
- must not be frayed or cracked.
NB! Line side rails´ gliding system must not
be lubricated with oil - otherwise the bars will
move sluggishly.
Accessories checked.
A service contract can be made in the countries, where
Invacare®
has its own sales company.
In certain countries
Invacare®
offers courses in service and maintenance of the
SB755
TM
.
Spare parts lists and additional user manuals are available from the
Invacare®
homepage.
The motor cables on the mattress support can be replaced by pushing up the lock with a
screwdriver, and pulling out the cable.
UM_1518190_GB_DK_SE_NO_FI_DE_NL_FR_IT_PT_ver06.indd 34
2011-11-08 15:25:35
Содержание ScanBed 755
Страница 17: ...20 UM_1518190_GB_DK_SE_NO_FI_DE_NL_FR_IT_PT_ver06 indd 20 2011 11 08 15 24 03...
Страница 51: ...20 UM_1518190_GB_DK_SE_NO_FI_DE_NL_FR_IT_PT_ver06 indd 20 2011 11 08 15 31 17...
Страница 119: ...20 UM_1518190_GB_DK_SE_NO_FI_DE_NL_FR_IT_PT_ver06 indd 20 2011 11 08 15 45 55...
Страница 153: ...20 UM_1518190_GB_DK_SE_NO_FI_DE_NL_FR_IT_PT_ver06 indd 20 2011 11 08 16 12 29...
Страница 187: ...20 UM_1518190_GB_DK_SE_NO_FI_DE_NL_FR_IT_PT_ver06 indd 20 2011 11 08 16 37 47...
Страница 221: ...20 UM_1518190_GB_DK_SE_NO_FI_DE_NL_FR_IT_PT_ver06 indd 20 2011 11 08 16 45 21...
Страница 255: ...20 UM_1518190_GB_DK_SE_NO_FI_DE_NL_FR_IT_PT_ver06 indd 20 2011 11 09 08 13 42...