
51
PROCEDURE 13 - REPLACING ON/OFF SWITCH (FIGURE 1)
CAUTION
TO PREVENT ELECTRICAL SHOCK, ALWAYS DISCONNECT CONCENTRATOR FROM
ELECTRICAL OUTLET BEFORE SERVICING.
ON/OFF SWITCH
PROCEDURE 13
FIGURE 1 - REPLACING ON / OFF SWITCH
Control Panel
1. Unplug unit.
2. Remove cabinet (Refer to PROCEDURE 1 - REMOVING CABINET).
3. Remove control panel (Refer to PROCEDURE 9 - REMOVING CONTROL PANEL).
4. Remove and code the four (4) wires from back of existing On/Off switch.
5. Compress retaining grips on back of existing On/Off switch and push switch out through front of panel.
CAUTION
DO NOT install the On/Off switch upside down. Universal OFF symbol should be at bottom and
Universal ON symbol should be at the top. Possible damage to the concentrator may result if not
properly installed.
NOTE: Ensure proper orientation of the On/Off switch and wiring connections before installation.
See Detail A and Detail B below.
6. Reverse STEPS 4-5 to secure NEW On/Off switch.
7. Reinstall control panel (Refer to PROCEDURE 9 - REMOVING CONTROL PANEL).
8. Reinstall cabinet (Refer to PROCEDURE 1 - REMOVING CABINET).
O
N
/
O
F
F
S
W
I
T
C
H
ON
OFF
On/Off Switch
(See Detail A
and Detail B for
proper Switch
installation.)
Detail A - Front of
On/Off Switch -
Universal ON and OFF
Symbols.
On/Off
Switch
Black
Brown
Brown Jumper Wire
(From Circuit Breaker)
Black
Detail B - Back of
ON/OFF Switch -
Switch Wiring Orientation
Содержание 3LX
Страница 69: ...69 NOTES N O T E S ...
Страница 70: ...70 NOTES N O T E S ...