Intimus 16.99 SmartShred Скачать руководство пользователя страница 13

95663 3 03/22

GB

27

16.99 SmartShred

7  Malfunction

DANGER!

Risk of death by electrocution!

Always unplug the machine from the mains po-

wer supply, turn off the main switch and lock it 

with a padlock before opening the machine to 

carry out any repairs.

NOTE!

If operating errors occur, specific pop-up windows 

containing error messages appear on the display. 

These provide information about the cause and re-

medies.

If the problem cannot be resolved, touch the blue 

question mark — the address of your service tech-

nician appears.

7 .1  Motor faults

If the shredder or baler should become overloaded, an in-

stalled thermostat breaks the electrical circuit for full ope-

ration. A pop-up window containing the respective error 

message appears.

After cooling (approx. 30 min), the machine can be used 

again at full capacity.

NOTE!

If the machine no longer operates at full capacity, 

even though the overheated motor has been allo-

wed to cool down (pop-up window no longer clo-

ses), there is a defect in the machine. In this case, 

please inform our customer service department. 

7 .2  Fault checklist

If the machine is not functioning properly, you should check 

the following:

• 

is the machine plugged into the mains power supply?

• 

is the connector plug from the baler plugged into the 

outlet (fig. 1/4) at the shredder?

• 

has the safety switch activator (fig. 4/1) been inserted 

into the safety switch at the baler?

• 

has the key switch (fig. 7/1) been activated?

• 

is the mains switch (fig. 7/2) turned on?

• 

is the emergency stop bar (fig. 6) in the forward positi-

on?

 

¾

Pull red bar at table forward.

• 

is there a paper jam in the machine?

 

¾

Follow the instructions for 

„Automatic response in 

case of „overloading““, p. 22.

• 

are the inlet flap (fig. 1/5) and the discharge flap (fig. 1/1) 

at the baler closed?

• 

is the cover flap (fig. 1/3) closed?

 

¾

See description under 

„16.99 with baler: Jam outlet“, 

p. 22

.

• 

is the motor overloaded?

 

¾

Please refer to the section headed 

„Motor faults“, 

p. 27

.

• 

is there a phase failure?

 

¾

Check the three-phase fuse at the power supply so-

cket, and replace if necessary.

NOTE!

If none of the listed inspection points are relevant, 

or if other machine malfunctions are identified, the 

machine must not be operated! In such cases, ple-

ase inform our customer service department.

8  Maintenance / Disposing

8 .1  Gear box maintainance

DANGER!

Risk of injury from electric shock and moving 

parts!

Before opening the housing, switch off the ma-

chine at the main switch and unplug the mains 

plug.

NOTE!

The machine may not be modified in any way! 

Operation of the machine is prohibited if modifica-

tions are undertaken!

Both synchron gears, as well as the chain wheels and drive 

chains must be greased monthly.

Proceed as follows:

1 . 

Remove the right-hand side panel from the housing.

2 . 

Grease the above mentioned parts with a brush or a gre-

ase gun, and a standard, commercially available grease.

3 . 

Re-install the side cover and connect the machine  to 

the mains. The machine can be put back into operation.

8 .2  Energy saving tip

Be certain that the machine is turned off overnight  (main 

switch (fig. 7/2) switched to „0“).

8 .3  Checking the oil level

Unscrew the dipstick (fig. 26/1) in order to check the oil le-

vel. The marking on the dipstick must be wetted with oil. If 

this is not the case, add oil.

Содержание 16.99 SmartShred

Страница 1: ...ompacteur con compactador 16 99 SmartShred mit Austragsband with discharge conveyor avec bande de d charge con cinta de descarga Betriebsanleitung D Operating Instructions GB Instructions d op ration...

Страница 2: ...olls 26 7 Malfunction 27 7 1 Motor faults 27 7 2 Fault checklist 27 8 Maintenance Disposing 27 8 1 Gear box maintainance 27 8 2 Energy saving tip 27 8 3 Checking the oil level 27 8 4 Disposing of the...

Страница 3: ...tch covers fig 2 1 2 Fix the limit switch S8 with 2 screws M4x40 and nuts M4 below the switch cam of the switch flap fig 2 8 Undo the threa ded pin fig 2 9 Allen key 2 5 mm turn the cam into position...

Страница 4: ...e 1 3 2 4 000133 1 Strap roll holder 2 Strap roll 3 Dividing panel 4 Switch cabinet fig 5 Strap rolls 3 Initial start up 3 1 Application CAUTION Risk of injury Damage to the cutting mecha nism The shr...

Страница 5: ...gency stop This switch is used to switch the machine on and off position 1 or 0 3 Start button green Only in automatic mode When this button is pressed the shredder s cutting me chanism and conveyor b...

Страница 6: ...tton fig 9 Date Time screen Automatic mode main screen fig 10 The Automatic mode screen appears when the main switch is switched on and the key selector switch is turned to the right 1 2 3 4 5 6 7 8 0...

Страница 7: ...s stopped b Open Discharge Flap If the key is pressed and held for at least 2 seconds the baling ram travels a short distance in reverse and the locking lever fig 20 2 is advanced a short dis tance pr...

Страница 8: ...per up to about 550 sheets depending on the type and size of paper and also crumpled paper and card board Place any material to be shredded on the moving conveyor belt which feeds it to the cutting sy...

Страница 9: ...achine on again and continue shredding 1 2 3 000418 1 Conveyor belt housing 2 Handle 3 Cover flap fig 16 Emptying the conveyor belt housing NOTE The machine can only be started when the cover flap fig...

Страница 10: ...and discharge flaps are open The bale can be ejected in three different ways and then removed A Tie off and eject into plastic sack for small particles fig 9 10 11 12 and 13 B Tie off and eject witho...

Страница 11: ...et flap and open the discharge flap 2 Press the bale into the plastic sack and onto the dischar ge flap fig 21 by activating the Advance Ram key fig 13 1 3 Fold the end of the sack together and seal w...

Страница 12: ...n the inlet flap and remove both strap lifters fig 24 1 3 Open the strap brake fig 17 4 Insert the strap rolls fig 25 2 in to the strap roll holder fig 25 1 as shown with the strap ends pointing down...

Страница 13: ...rd positi on Pull red bar at table forward is there a paper jam in the machine Follow the instructions for Automatic response in case of overloading p 22 are the inlet flap fig 1 5 and the discharge f...

Страница 14: ...parts 10 Technical data Shredder Cutting size 10 x 70 mm 6 x 50 mm Cutting capacity in zwei Stapeln 10 x 70 mm 470 520 sheets 70g m2 6 x 50 mm 300 330 sheets 70g m2 Working width 500 mm Power 11 5 kW...

Страница 15: ...24 10 are connected in the dummy plug a Schaltplan angepasst J nger 11 05 2017 Main Switch 1 2 3 4 5 6 Q1 63A Hauptschalter L1 X1 L2 L3 PE U1 V1 W1 PE M1 7 5kW 9 0 3 M 1 2 K1M 11 0 32A 3 4 5 6 1 2 K2...

Страница 16: ...1 nderung 0 7 6 Gepr Ersatz von 8 9 3 5 4 25 06 2019 intimus International GmbH 4 2 Name 5 2 17 100 240VAC 24VDC 5A 24 28 8VDC U_Out ABL 8REM24050 TELEMECANIQUE a Schaltplan angepasst J nger 11 05 201...

Страница 17: ...DE E0 6 I6 DE E0 7 I7 8 8 Drehgeber rotary encoders COM2 DE E1 0 I8 DE E1 1 I9 13 3 Optional Schwimmerschalter ler Optional float switch oiler DE E1 2 I10 Wicklungsschutz Presse optional Wicklungsschu...

Страница 18: ...11 TB1 S11 S12 TB1 S12 S22 TB1 S22 S42 TB1 S42 S21 TB1 S21 S41 TB1 S41 S39 TB1 S39 11 12 K1M 11 0 11 12 K2M 11 1 A1 A2 9A K11M 1 2 6 8 3 4 6 8 5 6 6 9 12 11 6 6 5 6 K11M 6 8 3 4 K11M 6 8 1 2 K11M 6 8...

Страница 19: ...derung 0 7 6 Gepr Ersatz von 8 9 3 8 4 15 03 2022 intimus International GmbH 7 2 Name 5 5 17 a Schaltplan angepasst J nger 11 05 2017 X2 14 0 24 11 12 15 1 14 13 18 20 X1 47 48 49 50 51 52 53 54 A1 A2...

Страница 20: ...Automatic E0 0 5 1 I1 DE S2 24 Hand Manually E0 1 5 1 I4 DE A1 S4 12 Stop E0 4 5 2 I3 DE S3 14 Start E0 3 5 1 11 12 S4 Stop 13 14 S3 Start BN BK BU B1 Drehgeber rotary encoders I7 DE B1 BK Drehgeber...

Страница 21: ...14 Taster Vor Presse Button forward baler E5 2 6 1 5 K16 14 Taster Zur ck Presse Button Back baler E5 3 6 1 6 K17 14 Taster Stop Presse Button stop baler E5 4 6 1 X1 9 X1 10 57 58 59 60 95 96 F2 3 6...

Страница 22: ...14 Pressdruck erreicht Presse Press pressure reaches E5 7 6 1 10 K21 14 Ballen fertig Presse bales finished E6 0 6 1 X2 6 8 7 X1 61 63 64 A1 A2 K19 230V 14 11 10 2 A1 A2 K20 230V 14 11 10 3 A1 A2 K21...

Страница 23: ...6 6 22 21 11 0 A1 A2 K3M 18A A1 A2 K4M 32A A1 A2 K5M 9A 1 2 3 6 3 4 3 6 5 6 3 6 A1 A2 K6M 12A 14 13 7 3 21 22 7 3 X2 2 3 DA Q0 Shredder Vorw rts Shredder Forward A1 K1M A1 A0 0 5 2 DA Q1 Shredder R ck...

Страница 24: ...er Datum Datum Ersetzt durch Steuerstromkreis Ausg nge Control circuit outputs 1 nderung 0 7 6 Gepr Ersatz von 3 4 15 03 2022 intimus International GmbH 2 Name 5 5 TB2 Optional Zuf rderband Optional f...

Страница 25: ...14 4 15 03 2022 intimus International GmbH 13 2 Name 5 11 17 a Schaltplan angepasst J nger 11 05 2017 11 14 K22 13 5 X1 31 X1 32 1 2 M5 ler oiler M 1 33 34 13 14 S7 Schwimmerschalter float switch I9 D...

Страница 26: ...Bedienung 1 2 P M2 Aussto klappen ffner Motor M 1 P X1 14 P X1 15 16 17 18 19 X2 7 1 24 18 20 19 6 4 8 7 5 10 16 17 9 12 15 11 14 2 3 1 13 5 P X2 7 P X2 6 P X2 8 12 P X3 14 P X2 9 P X3 4 11 7 1 P X2...

Страница 27: ...95663 3 03 22 69 16 99 SmartShred SB No 991 0428 4 a Seite page 13 U1 V1 W1 21 22 PE M4 Motor Abf rderband Motor conveyor belt 3 M X2 21 22 23 PE 19 20 24 10...

Страница 28: ...ion 1 0 7 6 8 3 4 05 04 2019 intimus International GmbH 2 5 U1 V1 W1 PE M7 Absaugung suction 3 M 4 TB2 Optional Absaugung Optional suction A3 K12M A1 A2 2 6 3 1 2 K12M 16 4 32A 3 4 5 6 X7 U1 V1 W1 PE...

Страница 29: ...48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 F1 F2 F3 F4 Netzanschluss CEKON Power plug 3 phase M1 1 2 3 4 5 6 7 8 9 10 11 12 24 23 22 21 20 19 18 17 16 15 14 13 PE SW BN GR PE PE SW SW BN...

Страница 30: ...Seite page 16 Bearb juenger Datum Ubersicht Zus tzliche Klemmen f r Absaugung Overview Additional terminals for dust extraction 05 04 2019 intimus International GmbH PE U1 V1 W1 X7 PE SW BN GR Netzan...

Страница 31: ...ichtklemmenplan Schaltkasten Zuf rderband Overview Terminal diagram control box feed conveyor nderung Gepr Ersatz von 15 03 2022 intimus International GmbH Name PE L1 L2 L3 PE U1 V1 W1 1 2 3 4 13 14 1...

Страница 32: ...95663 3 03 22 74...

Страница 33: ...95663 3 03 22 75 16 99 SmartShred 12 Certificate of Conformity...

Страница 34: ...b H Leonard Bernstein Stra e 10 1220 Wien 43 0 1 2583621 0 contact at intimus com Belgium intimus International BeLux Generaal de Wittelaan 17B 2800 Mechelen Belgium 32 0 15 29 46 30 info belux intimu...

Отзывы: