
95663 3 03/22
GB
25
16.99 SmartShred
tance in reverse, and the locking lever (fig. 20/2) travels
a short distance forward in order to relieve pressure at
the discharge flap.
2 .
Slightly lift the locking lever (35).
3 .
Swing the discharge flap down.
A) Tie off and eject into plastic sack
000040
1
3
2
1
Discharge flap
2
Bale
3
Tape
fig. 21 Ejecting the bale
1 .
Close the inlet flap (fig. 20/3).
2 .
Open the discharge flap (fig. 20/1).
3 .
Press and hold the ”Advance Ram” key (fig. 13/1). The
completed, tied off bale is ejected into the plastic sack
and is pushed onto the discharge flap (fig. 21).
NOTE!
For reasons of safety, advance and reverse ram
travel is only possible in inching operation when
the discharge flap is open. The key must thus be
pressed and held in order to eject the bale.
4 .
Remove the sack from the sack frame (fig. 20/4).
5 .
Fold the end of the sack together and seal with tape
(fig. 21/3). The bale can now be removed.
B) Tie off and eject without plastic sack
Same as described under ”A)”, except no plastic sack is used.
The bale can be removed immediately after ejection.
C) Eject into plastic sack without tying off
NOTE!
In this case, the tie-off straps which have been laid
out inside the baling chamber must be removed
and rolled back onto the strap rolls (fig. 5/2).
1 .
Close the inlet flap and open the discharge flap.
2 .
Press the bale into the plastic sack and onto the dischar-
ge flap (fig. 21) by activating the ”Advance Ram” key
(fig. 13/1).
3 .
Fold the end of the sack together and seal with tape
(fig. 21/3). The bale can now be removed.
4 .
Return the baling ram to home position by pressing the
”Return Ram” key (fig. 13/3) and close the inlet flap.
NOTE!
This is only possible in inching operation when the
discharge flap is open.
6 .6 Installing a new plastic sack
NOTE!
If the bale is to be tied off, the straps must be laid
out as described under
„Inserting straps for a new
bale“, p. 25
before the sack is installed to the sack
frame (fig. 22) (does not apply for option ”C”).
000041
1
1
Sack frame
fig. 22 Installing a new plastic sack
1 .
Open the discharge flap and return the baling ram to its
rear, home position. The inlet flap remains closed.
2 .
Push the sack bit by bit over the sack frame (fig. 22) until
the entire sack has been mounted to the frame.
3 .
Close the discharge flap.
6 .7 Inserting straps for a new bale
1 .
Return the baling ram to home position by pressing the
”Return Ram” key (fig. 13/3).
NOTE!
This is only possible in inching operation when the
discharge flap is open.
2 .
Open the inlet flap.
3 .
Pull the straps out a distance equivalent to about one
flap length, guide the strap ends from the inside over
the strap hook (fig. 23/1+2), through the inlet opening
and up to the strap clamps (fig. 23/3). Secure the strap
ends here by wrapping them twice around the clamps.
Содержание 16.99 SmartShred
Страница 32: ...95663 3 03 22 74...
Страница 33: ...95663 3 03 22 75 16 99 SmartShred 12 Certificate of Conformity...