Interroll Transfer module SH 1400
Maintenance and repair
30
Version 1.0 (06/2022) en
Translation of original operating instructions
Preparatory and follow-up maintenance work
WARNING
Risk of injury from crushing and electrocution
Installation and maintenance tasks on a conveyor system while it is in operation can cause
crushing and electric shock.
4
Power down the entire conveyor module and ensure that it cannot be started accidentally.
Fasten screws with a tightening torque of 19 Nm.
Installing/removing
module between
connecting tabs
To replace the drive roller, the module must first be removed from the connecting tabs and,
therefore, the complete system.
2
3
1
2
3
1
Removing connecting tabs from the side frames
1
Screw
3
Side plate
2
Connecting tab
Requirement:
R
The module is shut down.
4
Disconnect the motor connecting cable from the control system or from the extension cable.