International Comfort Product WFEU Series Скачать руководство пользователя страница 29

Specifications are subject to change without notice.

29

441 01 7201 00

tablished that limit is functioning properly and will operate
if there is a restricted duct system or motor failure. If limit

control does not function during this test, cause must be
determined and corrected.

a. Run furnace for at least 5 minutes.

b. Gradually block off return air with a piece of cardboard

or sheet metal until the limit trips.

c. Unblock return air to permit normal circulation.

d. Burners will re- light when furnace cools down.

2. Check draft safeguard switch.

The purpose of this control is to cause the safe shutdown

of the furnace during certain blocked vent conditions.

a. Verify vent pipe is cool to the touch.

b. Disconnect power to furnace and remove vent connec-

tor from furnace vent elbow.

c. Restore power to furnace and set room thermostat

above room temperature.

d. After normal start- up, allow furnace to operate for 2

minutes, then block vent elbow in furnace 80 percent
of vent area with a piece of flat sheet metal.

e. Furnace should cycle off within 2 minutes. If gas does

not shut off within 2 minutes, determine reason draft
safeguard switch did not function properly and correct

condition.

f. Remove blockage from furnace vent elbow.

g. Switch will auto- reset when it cools.
h. Re- install vent connector.

Table 10 – Gas Rate (Cu Ft./Hr.)

SECONDS

FOR 1 REVOLUTION

SIZE OF TEST DIAL

SECONDS

FOR 1 REVOLUTION

SIZE OF TEST DIAL

1

Cu Ft.

2 Cu Ft.

5 Cu Ft.

1 Cu Ft.

2 Cu Ft.

5 Cu Ft.

10

360

720

1800

50

72

144

360

11

327

655

1636

51

71

141

355

12

300

600

1500

52

69

138

346

13

277

555

1385

53

68

136

340

14

257

514

1286

54

67

133

333

15

240

480

1200

55

65

131

327

16

225

450

1125

56

64

129

321

17

212

424

1059

57

63

126

316

18

200

400

1000

58

62

124

310

19

189

379

947

59

61

122

305

20

180

360

900

60

60

120

300

21

171

343

857

62

58

116

290

22

164

327

818

64

56

112

281

23

157

313

783

66

54

109

273

24

150

300

750

68

53

106

265

25

144

288

720

70

51

103

257

26

138

277

692

72

50

100

250

27

133

267

667

74

48

97

243

28

129

257

643

76

47

95

237

29

124

248

621

78

46

92

231

30

120

240

600

80

45

90

225

31

116

232

581

82

44

88

220

32

113

225

563

84

43

86

214

33

109

218

545

86

42

84

209

34

106

212

529

88

41

82

205

35

103

206

514

90

40

80

200

36

100

200

500

92

39

78

196

37

97

195

486

94

38

76

192

38

95

189

474

96

38

75

188

39

92

185

462

98

37

74

184

40

90

180

450

100

36

72

180

41

88

176

439

102

35

71

178

42

86

172

429

104

35

69

173

43

84

167

419

106

34

68

170

44

82

164

409

108

33

67

167

45

80

160

400

110

33

65

164

46

78

157

391

112

32

64

161

47

76

153

383

116

31

62

155

48

75

150

375

120

30

60

150

49

73

147

367

Содержание WFEU Series

Страница 1: ...4 START UP ADJUSTMENT AND SAFETY CHECK 26 START UP PROCEDURES 26 ADJUSTMENTS 26 CHECK SAFETY CONTROLS 28 SERVICE AND MAINTENANCE PROCEDURES 30 INTRODUCTION 31 ELECTRICAL CONTROLS AND WIRING 31 CARE AN...

Страница 2: ...and ventilation air to the furnace space as specified in Air for Combustion and Ventilation section 4 Combustion products must be discharged outdoors Connect this furnace to an approved vent system on...

Страница 3: ...FURNACE SIZE A B C D VENT CABINET WIDTH IN MM OUTLET WIDTH IN MM TOP FLUE COLLAR ONLY IN MM BOTTOM WIDTH IN MM VENT CONNECTION SIZE IN MM SHIP WT LB KG WFEU040B036 17 1 2 445 15 7 8 403 11 9 16 294 16...

Страница 4: ...ational Fuel Gas Code NFGC NFPA 54 ANSI Z223 1 and the Installation Standards Warm Air Heating and Air Conditioning Systems ANSI NFPA 90B General Installation S Current edition of the NFGC and the NFP...

Страница 5: ...Firmly touch the clean unpainted metal surface of the furnace chassis which is close to the control Firmly touch the clean unpainted metal surface of the furnace chassis which is close to the control...

Страница 6: ...nstallations may require OUTDOOR AIR for combustion due to chemical exposures S Commercial buildings S Buildings with indoor pools S Laundry rooms S Hobby or craft rooms and S Chemical storage areas I...

Страница 7: ...00 4 400 5 500 6 600 0 20 3 150 4 200 5 250 3 300 4 950 6 600 8 250 9 900 0 10 6 300 8 400 10 500 6 600 9 900 13 200 16 500 19 800 0 00 NP NP NP NP NP NP NP NP Air Changes Hour FIRE HAZARD Failure to...

Страница 8: ...ON AIR OPENINGS SHALL BE AT LEAST 3 IN 305mm 305mm 305mm 305mm 305mm 76mm Minimum dimensions of 3 in 76 mm NOTE Use any of the following combinations of openings A B C D D E F G A03174 Fig 7 Air for C...

Страница 9: ...reely communicates with the outdoors provided there are adequate permanent ventilation openings directly to out doors having free area of at least 1 in 2 4 000 Btuh of total input rating for all gas a...

Страница 10: ...ved for use on combustible flooring when any one of the following 3 accessories are used S Downflow combustible floor subbase S Manufacturer s approved Cased Coil or Coil Casing 1 Determine applicatio...

Страница 11: ...20 508 20 508 HORIZONTAL INSTALLATION FIRE EXPLOSION AND CARBON MONOXIDE POISONING HAZARD Failure to follow this warning could result in personal injury death and or property damage Do not install th...

Страница 12: ...ing the furnace the return air shall also be handled by duct s sealed to the furnace casing and terminating outside the space containing the furnace Secure ductwork with proper fasteners for type of d...

Страница 13: ...A02020 Fig 14 Duct Flanges 1 4 6mm THREADED ROD 4 REQ SECURE ANGLE IRON TO BOTTOM OF FURNACE WITH 3 8 x3 4 19mm SCREWS TYPICAL FOR 2 SUPPORTS 1 25mm SQUARE 1 1 4 x1 1 4 x1 8 32x32x3mm ANGLE IRON OR U...

Страница 14: ...CH STRAP THE STRAPS SHOULD BE VERTICAL AGAINST THE FURNACE SIDES AND NOT PULL AWAY FROM THE FURNACE SIDES METHOD 1 FOLD ALL STRAPS UNDER FURNACE AND SECURE WTH 4 8 x 3 4 19 mm SHEET METAL SCREWS 2 SCR...

Страница 15: ...pipe shall be installed at the furnace gas control valve and extend a minimum of 2 in 51 mm outside the furnace WARNING Gas piping must be installed in accordance with national and local codes Refer t...

Страница 16: ...ow performance included 3 4 in 19 mm washable filter media such as contained in factory authorized accessory filter rack To determine airflow performance without this filter assume an additional 0 1 i...

Страница 17: ...ge without notice 17 441 01 7201 00 A02075 Fig 19 Upflow Return Air Configurations and Restrictions A02163 Fig 20 Downflow Return Air Configurations and Restrictions A180279 Fig 21 Horizontal Return A...

Страница 18: ...n electrical fault should occur This may consist of electrical wire conduit approved for electrical ground or a listed grounded power cord where permitted by local code when installed in accordance wi...

Страница 19: ...ound wire to green ground screw on J Box bracket 5 Connect line voltage leads as shown in Fig 24 6 Reinstall cover to J Box Do not pinch wires between cover and bracket BX CABLE INSTALLATION IN FURNAC...

Страница 20: ...C LINE CONNECTION L1 INDUCER MOTOR AND IGNITER 115 VAC NEUTRAL CONNECTOR ECM BLOWER 115VAC PRIMARY OF TRANSFORMER 115 VAC EAC 115 VAC WHEN USED FLAME SENSOR HUMIDIFIER 115 VAC WHEN USED NO CONNECTION...

Страница 21: ...uilding codes the current edition of National Fuel Gas Code ANSI Z223 1 NFPA 54 NFGC Parts 12 and 13 the local building codes and furnace and vent manufacturers instructions These furnaces are design...

Страница 22: ...207 299 15 4 5 NR 152 233 334 20 6 0 NR NR 250 368 30 9 1 NR NR NR 404 Table 9 Minimum Allowable Input Rating of Space Heating Appliance in Thousands of BTUH per Hour VENT HEIGHT FT M INTERNAL AREA O...

Страница 23: ...Specifications are subject to change without notice 23 441 01 7201 00 A180242 Fig 25 Chimney Inspection Chart...

Страница 24: ...ow does NOT count as part of the number of vent connector elbows The vent connector can exit the furnace through one of two locations on the casing 1 Attach the single wall vent connector to the furna...

Страница 25: ...TES 1 2 4 7 8 9 on the page following these figures A03213 Fig 28 Horizontal Left Application Vent Elbow Left SEE NOTES 1 2 4 5 6 7 8 9 on the page following these figures A03207 Fig 29 Downflow Appli...

Страница 26: ...Failure to make proper con nections will result in improper operation See Fig 24 3 Gas supply pressure to the furnace must be greater than 4 5 In W C 0 16 psig but not exceed 14 In W C 0 5 psig 4 Chec...

Страница 27: ...liances and pilots served by the meter b Run furnace for 3 minutes in heating operation c Measure time in seconds for gas meter to complete 1 revolution and note reading The 2 or 5 cubic feet dial pro...

Страница 28: ...cord amp draw across terminals when furnace is in heating and after blower starts 4 Set heat anticipator on thermostat per thermostat in structions and install on subbase or wall R Y W G 10 TURNS THER...

Страница 29: ...kage from furnace vent elbow g Switch will auto reset when it cools h Re install vent connector Table 10 Gas Rate Cu Ft Hr SECONDS FOR 1 REVOLUTION SIZE OF TEST DIAL SECONDS FOR 1 REVOLUTION SIZE OF T...

Страница 30: ...tlet Pressure for Gas Heat Values at Altitude 100 000 Tabulated Data Based on 100 000 BTUH Input for 0 ft 0m to 2000 ft 1524 M above sea level ALTITUDE RANGE ft m RANGE ft m HEAT VALUE AT ALTI TUDE Bt...

Страница 31: ...trol See Fig 38 Any shorts of the 24 v wiring during installation service or maintenance will cause this fuse to blow If fuse replacement is required use ONLY a 3 amp fuse The control LED will display...

Страница 32: ...essary 4 Check electrical connections for tightness and controls for proper operation each heating season Service as necessary 5 Inspect the vent pipe vent system before each heating season for rust c...

Страница 33: ...6 If furnace is operating properly RELEASE BLOWER ACCESS DOOR SWITCH Remove any jumpers or reconnect any disconnected thermostat leads Replace blower access door 17 Reinstall outer door 18 Cycle furna...

Страница 34: ...equate seal may occur and RTV sealant G E 162 6702 or Dow Corning 738 are needed before starting installation NOTE DO NOT substitute any other type of RTV sealant 12 Apply new sealant to flange of col...

Страница 35: ...ation of the Heat Blower Off Delay timing The Heat Blower Off Delay is field selectable 90 120 150 180 NOTE 120 is default setting OFF The controls returns to the stand by mode until either a thermost...

Страница 36: ...Specifications are subject to change without notice 36 441 01 7201 00 A180211 Fig 38 Wiring Diagram...

Страница 37: ...ses and the CFH is present the furnace returns to normal operation Check Main limit Draft Safeguard Burner Thermal Switch are all in the Main Limit Circuit Check for any blockages in flue pipe or blow...

Страница 38: ...IZE MAJOR SERIES MINOR SERIES WFEU 060 C 60 A 1 TO OBTAIN INFORMATION ON PARTS Consult your installing dealer or the classified section of your local telephone directory under the Heating Equipment or...

Отзывы: