Intergraph Salient Fibre Channel Скачать руководство пользователя страница 9

7

4.  If you are only installing eight drives, place the dummy carriers (CGEN576) into the

remaining drive bays in the left column.  These install the same way as the regular
drives and will look the same once installed, with the exception of the serial number
label (the dummy carriers do not have serial number labels).  Otherwise, continue
installing the drives as described in steps 2 and 3.

NOTE

Use a torx driver (CTOL805) to lock a drive.  Insert the torx driver into the red, star-shaped
hole on the drive face.  Turn the driver counterclockwise until you see a red tab appear in the
drive face; this indicates that the drive is locked and cannot be opened accidentally.  See the
SS-1200-FCAL Rack Installation and User Guide for more information on these anti-tamper
locks.

Setting Up the Fibre Channel Storage System

Once you have installed all of the storage system components, you are ready to hook it up to
a system and a power outlet and start creating.  There are some things the system must have;
if you purchased the StudioZ GT1 workstation, it will have all of the requirements necessary
for the Fibre Channel storage system.

NOTE

See the 

StudioZ GT for SOFTIMAGE|DS System Guide for information on this workstation.

Workstation Requirements

StudioZ GT1 base unit

Q-Logic adapter card (CINFE50)

Q-Logic driver software

Microsoft Windows NT 4.0

To connect the Fibre Channel storage system to your workstation:

1.  Make sure that your workstation is properly shut down and powered off.

2.  Connect the HSSDC end of the Fibre Channel cable (MCBL337) to the Fibre Channel

port on the Q-Logic adapter card in the StudioZ GT1 base and tighten the thumb screws.

3.  Connect the DB9 end of the Fibre Channel cable to the FC-AL Tx/Rx port on the Fibre

Channel I/O module (column 2 of slot 3) and tighten the thumb screws.

4.  Insert the key into the operator panel and turn it to the Service position (this is the key

that was taped to the operator panel module before you installed the module).

5.  Connect the two female ends of the bifurcated power cord to both power supplies, then

plug the male end of the bifurcated power cord into the female end of the power cord.
Plug this into your power source (preferably the same power source that your StudioZ
GT1 workstation uses).

NOTE

The part number for the power cord depends on the country where the workstation will be
used.  Make sure you obtain the proper power cord for your region.

Содержание Salient Fibre Channel

Страница 1: ...Salient Fibre Channel Storage System Tower Assembly Instructions August 1998 DHA024800...

Страница 2: ...ocument is subject to change without notice and should not be considered a commitment by Intergraph Computer Systems Intergraph Computer Systems shall not be liable for technical or editorial errors i...

Страница 3: ...chassis and make sure you have all the components and then determine which end of the chassis will be the top of the tower unit To unpack and orient the chassis 1 Open the box containing the Fibre Cha...

Страница 4: ...cover which is protected by a layer of protective wrap CAUTION All of the tower kit components are contained within the tower kit cover To ensure that you do not scratch the surface of the tower cover...

Страница 5: ...on the foot 3 Use two M6 pan head screws and washers to attach the front of the foot to the bottom front of the chassis the pan head screws and their washers are the larger of the two types of screws...

Страница 6: ...the rear bracket screws you inserted in step 7 so that they are fully countersunk 10 Turn the unit upside down again and use six M5 countersunk screws to secure the cover to the unit 11 Turn the unit...

Страница 7: ...omponents 1 Remove the protective covering from each of the storage system components 2 Check the power supplies and verify that the voltage switch is set to the correct voltage either 115V or 220V fo...

Страница 8: ...in the middle column of slot 3 Again make sure that the This Side Up label faces the left of the chassis rear 10 Place the smaller blanking plate CGEN575 over the last column 3 in slot 3 11 Remove the...

Страница 9: ...nnel storage system NOTE See the StudioZ GT for SOFTIMAGE DS System Guide for information on this workstation Workstation Requirements StudioZ GT1 base unit Q Logic adapter card CINFE50 Q Logic driver...

Страница 10: ...drives and you can purchase four additional drives for each storage system To add an additional Fibre Channel storage system 1 Connect the HSSDC end of the Fibre Channel cable MCBL337 to the Fibre Cha...

Страница 11: ...he cable thumbscrews 6 Power up your StudioZ GT1 workstation and turn the keys in each Fibre Channel I O module from Service to Run to power up the Fibre Channel storage systems See SS 1200 FCAL Rack...

Отзывы: