6
NOTE
Alignment screws are located in the upper left corner of each power supply bay, and in the
upper left corner of the slot 2. You only need to remove the alignment screws above each
power supply bay at this time.
CAUTION
Be very careful with the power supplies, as they are heavy and the connecting pins can be
easily bent.
5. Install the first power supply (CPWS17900) in slot four; hold down the black tab to
make sure the component clicks into place.
CAUTION
Make sure the label on the power supply faces the left of the chassis rear, or the power
supply will break when you install it. This is the same label that would be on the top of the
power supply in a rack-mount unit.
6. Using the same method described in the previous step, install the second power supply
(CPWS179) into slot 1.
7. Reinsert the two alignment screws and washers that you removed in step 2.
8. Remove the key that is taped to the operator panel (CINFE48), and install the panel in
the column 1 of slot 3, making sure that the “This Side Up” label on the operator panel
faces the left of the chassis rear; this label would be on the top in a rack-mount unit. Set
the key aside for now.
9. Insert the I/O module (CINFE49) in the middle column of slot 3. Again, make sure that
the “This Side Up” label faces the left of the chassis rear.
10. Place the smaller blanking plate (CGEN575) over the last column (3) in slot 3.
11. Remove the alignment screws and washers above slot 2, and place the final blanking
plate (CGEN574) over slot 2.
Populating the Fibre Channel Storage System Drive Bays
The following instructions show you how to install all of the drives in the proper order.
There are eight drives (CDSK238) and four dummy carriers (CGEN576) in a typical setup.
To open the drive front, you will push the indentation on the plastic cover. This indentation
should be on the top of each drive.
To install the Fibre Channel storage system drives:
1. Turn the storage system around so that you are looking at the front of the unit (refer to
the illustration in “Unpacking and Orienting the Fibre Channel Chassis” if necessary).
2. Press the indentation on a drive to open its door, and install this first drive in the bottom
right column of slot 4. Push the drive all the way in until the face of the drive is flush
with the trim on the tower cover, then press the indentation until it clicks shut. Again,
the indentation on the drive should be on the top.
3. Continue to install the remaining drives in the same fashion, working your way to the
top of the right column, then starting over at the bottom (slot 4) of the middle column.