Intergas 18 OV Скачать руководство пользователя страница 28

Intergas Heating Ltd

 

28

 

9.2

 

Commissioning the appliance 

 

 

 

 

Read-out 

 

 

Operation 

On / off 

  A 

On / Off button 

CH operation or setting maximum CH temperature 

  B 

DHW / CH button, for setting desired temperature 

DHW operation or setting DHW temperature (

not applicable for Compact HRE OV

)    C  -  button   

Desired temperature of CH or DHW in °C / Fault code/ Time 

  D  +  button   

Clock “on” CH enabled   

  E 

Clock function setting  

Clock “off” CH disabled   

  F 

N/a 

 7 

N/a 

  G  Service button   

N/a 

  H  Reset  button 

Operating code 

   

 

10 

Flashes to indicate fault 

   

 

 
Once the preceding actions have been carried out, the appliance may be started up. 

1.

 

Press the  

 button , to start the appliance. 

When an indirectly heated DHW storage cylinder is connected the storage cylinder is 

heated up and the service 

 display will show 

 3

,  

 and 

6

  

 (depending on the status 

of the DHW disabling switch and/or Open Therm regulation). 

2.

 

Adjust the pump setting depending on the maximum power set and the resistance in the 
CH installation. For the water head of the pump and the pressure loss of the appliance see 
§ 10.5. 

3.

 

Set the room thermostat higher than the room temperature. The appliance will now switch 

to CH operation:  

 5 

  will show on the 

 display. 

4.

 

Heat the installation and the appliance to approximately 80°C.  

5.

 

Check the temperature difference between the supply and return for the appliance and the 
radiators. This must be approximately 20°C. For this purpose set the maximum power on 
the service panel. See setting maximum power. If necessary adjust the pump setting 
and/or the radiator valves. For the minimum flow see § 10.5. 

6.

 

Switch the appliance off. 

7.

 

Bleed the appliance and the installation after cooling. 

8.

 

Check correct operation of the heating and hot water supply. 

9.

 

Instruct the user on filling, bleeding and the operation of the clock, heating and hot water 
supply. For setting the clock see § 9.3. 

 

Notes 

 

The appliance is equipped with an electronic boiler controller, which ignites the 
burner and continuously monitors the flame during each request for heat from the 
heating or from the hot water supply. 

 

 

Содержание 18 OV

Страница 1: ...5 30 OV G C 41 291 06 Installation service and user instructions Please read these installation instructions carefully before installing and using the appliance Keep these installation instructions wi...

Страница 2: ...Installers are required to carry out installation commissioning and servicing work in accordance with the Benchmark Code of Practice which is available from the Heating and Hotwater Industry Council w...

Страница 3: ...different gas type 39 11 Faults 40 11 1 Fault codes 40 11 2 Other faults 40 12 Maintenance 43 12 1 Disassembly 43 12 2 Cleaning 43 12 3 Assembly 44 12 4 Combustion 44 13 Electrical connections 45 13 1...

Страница 4: ...gulations currently in force Read these instructions carefully before installing or using the appliance 1 3 Manual handling When moving the boiler always keep your back straight bend your knees don t...

Страница 5: ...1 8 Service and technical support For information about specific adjustments installation maintenance and repair work please contact Intergas Heating Ltd Building 94 Bay 1 Vantage Point The Pensnett E...

Страница 6: ...d input not exceeding 70kW Part 2 Air Supply BS 5546 2000 Installation of gas hot water supplies for domestic purposes BS 5549 1990 Forced circulation hot water systems BS 6700 1997 Design Installatio...

Страница 7: ...Gas consumption G20 m3 h 0 58 1 94 0 75 2 46 0 79 2 80 Gas consumption G31 m3 h 0 22 0 74 0 28 0 94 0 30 1 07 Appliance pressure loss CH mWk See 10 5 See 10 5 See 10 5 NOx class natural gas 5 5 5 NOx...

Страница 8: ...55 69 80 Sound power level LWA dB 45 45 50 CAUTION Please read all instructions before fitting this appliance This appliance is not intended for use of persons including children with diminished physi...

Страница 9: ...J Mains lead 230 V AC without plug stripped B Flow CH K Condensate trap C Return CH M Ionisation Ignition electrode D Sight glass N Fan E Sensor S1 O Gas valve F Heat exchanger P Position of data plat...

Страница 10: ...des direct burner ignition and flame supervision along with continuous modulation of the burner s gas supply 3 3 Parameter list All boiler adjustments are accessible through the parameter list in the...

Страница 11: ...tection is active This means that the external pump operates and the exchanger is heated up if the temperature of the water present in it falls too far If the frost protection is actuated code 7 is di...

Страница 12: ...tter two however the maximum is the temperature set on the display During CH operation the requested CH supply temperature is indicated on the operating panel The CH supply temperature can be set betw...

Страница 13: ...on continuesly in the display the CH water pressure is shown By pressing the button continuesly in the display the ionisation current is shown 4 7 Frost protection FROST PROTECTION To prevent freezing...

Страница 14: ...installing is connected to the appropriate connections on the boiler It is important to thoroughly flush the water circuits after isolating the boiler in order to remove any fluxes and debris from the...

Страница 15: ...roof 087910 Weather slate flat roof 087372 Extension L 100 incl wall bracket 082975 Horizontal telescopic offset wall terminal Only to be used in combination with the base adapter on the boiler 08129...

Страница 16: ...Intergas Heating Ltd 16 Plume management kit 081294 Elbow 90 for plume management kit 081284 Elbow 60 for plume management kit 081285 Extension L 100 incl wall bracket for plume management kit 081286...

Страница 17: ...imensions A Supply CH 22 B Return CH 22 C Gas F Condensate drain 25 flexible G Drain PRV 15 H 710 Compact HRE OV 30 H 650 Compact HRE OV 24 H 590 Compact HRE OV 18 Z1 Standard flue pipe 60 100 concent...

Страница 18: ...y be realized by opening a cupboard door Flammable fluids and materials must be stored at least 1m away from the boiler The wall on which the boiler is mounted must be sufficiently strong to support t...

Страница 19: ...e 9 Connect the flexible tube from the condensate trap to the drain via an open connection The condensate discharge system must be made of plastic no other materials may be used The discharge duct mus...

Страница 20: ...connection Always use the enclosed compression fittings 8 1 1 The CH system should be equipped with A drain tap at the lowest point s of the installation A heating system feed tank 8 1 2 Thermostatic...

Страница 21: ...to provide access 4 Consult sections 8 3 1 and chapter 13 for making the connections 5 After making the desired connections plug the appliance into an earthed wall socket 8 3 1 Electrical connections...

Страница 22: ...the boiler is adjusted to the most optimal value The Open Therm OT room thermostat has te be connected tot the contacts 11 and 12 of connector X4 see chapter 13 electrical diagram CAUTION Connecting...

Страница 23: ...ee diagram B Gully C Condensate discharge from boiler D Servicable waste trap E 5 20 mm meter F 100 mm G 110 mm H 450 mm If an externally run condensate drainage pipe is used the following measures sh...

Страница 24: ...r window into a dwelling 1200 mm K Vertically from a terminal on the same wall 1500 mm L Horizontally from a terminal on the same wall 300 mm M Above an opening air brick opening windows etc 300 mm N...

Страница 25: ...etres CAUTION Only an Intergas approved flue is to be used with this product Failure to comply with this requirement will invalidate your guarantee and may lead to a dangerous situation The horizontal...

Страница 26: ...y joint and at changes of direction Bends should be viewable from both directions where the inspection hatch cannot be positioned at the bend Where suitable access is not provided the appliance MUST N...

Страница 27: ...st be obtained with all other gas appliances at the property working 9 1 3 Combustion The combustion for this appliance has been checked adjusted and preset at the factory for operation on the gas typ...

Страница 28: ...set and the resistance in the CH installation For the water head of the pump and the pressure loss of the appliance see 10 5 3 Set the room thermostat higher than the room temperature The appliance wi...

Страница 29: ...second period CH on 22 00 and 4 End second period CH off By pressing the button the new times will be stored in the boiler controller In the service display P appears When the clock is in period 1 or...

Страница 30: ...is equipped with frost protection If the temperature of the heat exchanger becomes too low the burner switches on until the temperature of the heat exchanger is sufficient If there is a possibility o...

Страница 31: ...o flash Pressing the key repeatedly results in a different function LED flashing each time When the LED is flashing the indicated function can be set with the and key The value set is shown on the dis...

Страница 32: ...ion 1 1 1 0 step modulation off during CH operation 1 step modulation on during CH operation C Minimal CH rpm 30 30 30 Adjustment range 25 to 50 C External switch keep hot facility 40 40 40 Not applic...

Страница 33: ...he pump setting can be adjusted Consult the manual of the external pump for advice Check the temperature difference between the appliance supply and return this must be approximately 20 C The minimum...

Страница 34: ...ment must be performed first at maximum power and thereafter on the minumum power see 10 8 1 and 10 8 2 For reference reasons the tables below contain O2 and CO2 values When the CO2 or O2 value is inc...

Страница 35: ...sure a capital H is shown in the display to ensure the appliance to run at maximum power 7 Wait until the reading of the flue gas analyser is stable minimal 3 minutes 8 Note the measured value O2 H o...

Страница 36: ...ne 3P G31 CO2 CO2 Maximum value CO2 H CO2 H 0 3 Minimum value 8 4 9 4 Important The gas air ratio is set correctly when the measured value at minimum output is within the upper and lower limit Adjusti...

Страница 37: ...5a is for natural gas 4b and 5b is for Propane The value measured at maximum output as noted during the measurement on maximum output CO2 H or O2 H Turning clockwise of the adjustment screw will rais...

Страница 38: ...mBar Measured value am maximim power See 10 8 1 Prescribed value at minimum power CO2 H 0 3 CO2 H CO2 L 10 8 10 5 0 1 10 6 10 3 0 1 10 4 10 1 0 1 10 2 9 9 0 1 10 0 9 7 0 1 9 8 9 5 0 1 Example when us...

Страница 39: ...ds the rear B 5 Replace the O ring C and the gas restriction D with the rings from the conversion set 6 Re assemble in reverse sequence 7 Open the gas tap 8 Check the gas connections before the gas va...

Страница 40: ...ion gap Gas supply pressure too low of failling Gas valve or ignition unit not powered 5 Poor flame signal Condensate drain blocked Check adjustment of gas valve 6 Flame detection fault Replace igniti...

Страница 41: ...on gap Replace the ignition electrode Replace the ignition unit on the gas valve 11 2 3 Burner resonating Possible causes Solution Gas supply pressure too low The house pressure switch may be faulty C...

Страница 42: ...et for the installation Adjust the power See setting maximum CH power No No heat transfer as a result of lime scale or fouling in the heat exchanger De scale or flush the heat exchanger on the CH side...

Страница 43: ...ipe is above the condensate drain pan connection Pull the bottom of the pipe forwards 2 and remove the pipe downwards 3 turning it anti clockwise 7 Lift the condensate drain pan on the left hand side...

Страница 44: ...flue pipe components for leakage 12 Check the gas air adjustment 13 Fit the casing tighten the two screws left and right of the display and close the display cover 14 Check the heating and if applica...

Страница 45: ...thermostat remove connection 6 7 8 9 Outdoor sensor 12k ohm 25 C 11 12 OpenTherm thermostat remove connection 6 7 Connector X2 230V 1 3 Room thermostat 230 AC 1 Switch live 3 Live fused 1 3 Frost the...

Страница 46: ...Intergas Heating Ltd 46 13 3 Typical Y Plan connection 13 4 Typical S Plan connection...

Страница 47: ...nition module 801477 Condensate trap 844187 Condensate collector 847037 Seal gas valve inlet 875757 O ring gas restriction ring 875827 O ring front plate Compact HRE OV 30 876597 O ring front plate Co...

Страница 48: ...as company The instructions for installation and use which we issue for the boilers concerned should be complied with in full 5 The manufacturer s liability under the agreement is expressly limited to...

Страница 49: ...Intergas Heating Ltd 49 17 GAS BOILER SYSTEM COMMISSIONING CHECKLIST...

Страница 50: ...Intergas Heating Ltd 50 18 SERVICE RECORD...

Страница 51: ..._______________________________________________________________________________________________________________ ________________________________________________________________________________________...

Страница 52: ...a ISO 9001 certified production faccility Intergas Heating Ltd Intergas Heating Ltd Tel 01527 888000 88324802 Building 94 Bay 1 Vantage Point Fax 01384 279480 The Pensnett Estate info intergasheating...

Отзывы: