7
.
Pedal shaft installation (same left and right)
the pedal pipe rear clamp weldment (35), and then put on the wave elastic washer
Pass the pedal shaft (30) through
(28)
and pedal shaft spacer (54) in turn, then screw the pedal shaft (30) onto a crank (67), tighten the pedal shaft with a
booster rod and lock it with a lock nut (as shown in fig
.
7)
Figure 7 Figure 8
Note:
The left and right threads must be installed in a matching way, and there are left and right marks on the
corresponding spare parts: left thread "L" and right thread "R".
8.
Install foot pedals
Align the pedals (5) (one on the left and one on the right) back and forth, and fix them on the pedal tube (4) with four
sets of hexagon-
head bolts M8×50(37), flat washers ф 8 (50) and locknuts M8(42). (see fig
.
8)
9
.
Left and right hand handle
Use four sets of hexagon-
head bolts M8×45(55), arc washers ф 8 (52), spring washers ф 8 (75) and cap nuts M8(65) to
connect the two handle tubes (14, 15) to the upper ends of the left and right swing arms (3). (see fig
.
9)
Note:
Hexagon head bolts must be inserted into hexagonal holes of swing arms.
10.Install the nut cover
After the whole machine is installed and adjusted, the nut cap (13) is clamped at the joints of
the U-shaped seat
weldment (8), the swing arm (3) and the pedal tube (11). (see fig
.
10)
Figure 9
Figure
10
11
.
Seat cushion installation
Install the seat cushion (85) on the seat cushion adjusting frame (83) with three sets of
nylon nuts M
8(67), spring washers
ф
8 (75) and flat washers
ф
8 (71). (see fig
.
11)
Figure 11
Содержание IT-E240
Страница 1: ...IT E240 INTER TRACK Luxury Magnetic Elliptical Machine...
Страница 3: ......