Assembly instruction
Light fixture with current-carrying
steel cables, cavity boxes and
external power supply unit.
Mounting of the cavity boxes with integrated steel
cable grippers.
Make sure the ceiling has sufficient load-carrying
capacity!
1. Mark the 4 positions of the cavity boxes on the
ceiling according to the drilling template on page 11.
2. Cut out a ceiling cavity with Ø 68 mm / 2.67“
2
.
3. Connect the enclosed secondary supply cable to the cavity
box
3
and connect the cable to the canopy (max. 3m). Observe
connection diagram R (from p.12) and marking on luminaire.
4. Attach the cavity box to the ceiling with 2 cross-recessed screws
(the thickness of the ceiling must be max. 40 mm / 1.57“).
5. Insert the steel cables (which are already mounted on the fixture)
through the hole in the cover plate in the cable grippers
4
.
6. Lift the light fixture in the requested position and adjust by
applying slight pressure on the steel cable grippers
5
.
7. Shorten excessive steel cables.
Shortened cables can only be replaced by the factory!
The steel cable grippers cannot be used for outdoor are-
as. Make sure cables are not damaged. Prior to moun-
ting, the nozzle of the steel cable bracket has to have
noticeable spring pressure. In order to ensure full sus-
pension, the steel cables have to be clean and free from
grease, oil and rust. The steel cable grippers can only be
used in connection with the provided fixation cables for
stationary and static loads.
8. Fix cover with two screws
6
.
suspended ceiling
ceiling
external power supply unit
cover Ø 80 mm / 3,14“
max.
40 mm
1.57“
Ceiling cutout Ø 68 mm / 2.67“
50 mm