I N S T A L L A T I O N M A N U A L
D U R O - S P R I N G ™
10
DS-IM Rev. 12/09 (BK-DS INSTALL)
Fig. 1
Fig. 3
Fig. 2
Pool Edge
Recommended Minimum
Concrete Area for Diving Bases
– PLAN VIEW –
48” (4’)
96” (8’)
The minimum
concrete depth
shall be 6” for
the diving base
concrete pad.
Example of a Paver Jig in Relationship to Concrete Pad
– SIDE VIEW –
SOIL
CONCRETE
6” min.
Layer of
setting
material
to secure
pavers to
concrete.
PAVERS
3”
max.
Drawing Not To Scale
HEIGHT ABOVE FINAL
DECK SURFACE
See Figure 3 Below
INTER-FAB
MIN. JIG
PAVER JIG
PAVER JIG
HEIGHT ABOVE
DIVING BASE
DEPTH
PART NUMBER
BOLTS
FINAL DECK SURFACE
LA MESA BASE / LOS ARCOS BASE
3.5”
LM-J6 PAVER
1/2” X 8” Carriage SS
1.5”
– WITH 8’ JIG
3.5”
LM-J8 PAVER
1/2” X 8” Carriage SS
1.5”
– WITH 10’ JIG
3.5”
LM-J10 PAVER
1/2” X 8” Carriage SS
1.5”
DURO-SPRING BASE
4.5”
DS-J PAVER
5/8” X 10” Hex Head SS
1.5”
TECHNI-SPRING STEEL BASE
4.5”
TS-J PAVER
1/2” X 10” Hex Head SS
1.5”
TECHNI-SPRING FIBERGLASS BASE
4.5”
TSF-J PAVER
1/2” X 12” Hex Head SS
3.5”
BAJA BASE
4.5”
BA-J6 PAVER
1/2” X 10” Hex Head SS
1.5”
– WITH 8’ JIG
4.5”
BA-J8 PAVER
1/2” X 10” Hex Head SS
1.5”
CITY BASE
3.5”
CITY-J6 PAVER
1/2” X 8” Carriage SS
1.5”
When installing an Inter-Fab diving board and base set up using a paver kit, you must ensure that
all standard requirements for a diving board and base installation are met. The diving board and
base set up must be compatible with the type of pool on the intended installation and all
ANSI/NSPI-2003 requirements must be met.
Figure 1 illustrates the standard minimum concrete pad recommended for all Inter-Fab diving
board and base set ups, which is 4’ wide x 8’ long x 6” deep.
Figure 2 shows an example side view of a paver jig used in a paver installation. Pavers can be a
maximum of 3” thick. Pavers must be mechanically attached to the concrete pad using a setting
material (such as mortar or thinset for example) that is no thicker than 3/8”.
Refer to Figure 3 to determine how much of the jig needs to be exposed above the final deck surface.
You will need to factor in the thickness of your paver (3” MAX.) and the thickness of your setting
material (3/8” MAX.) for your individual installation.
Inter-Fab Inc. will not be responsible for damage to pavers caused by drilling or mechanically
attaching to concrete pad. Refer to paver manufacturer’s specific installation instructions
before beginning.
CONCRETE
DIVING BASE JIG
Minimum jig depth is either
3.5” or 4.5”. See Figure 3.
PAVER KIT INFO – SELECTED DIVING PRODUCTS