8
System statue LED
LED
Indicate
Description
PWR
ON
Power is connected/Function
natural
OFF
Power is disconnected or function
nu-natural
RUN
Flashing
System Running steadily
OFF
System did not run or running
un-steadily
ON
System Running un-steadily
LINK
ON
Ethernet port connect successfully
Flashing
Ethernet port has data transmission
OFF
Ethernet port connect unsuccessfully
RX1~RX4
OFF
None data receive
Flashing
In receiving data
TX1~TX4
OFF
None data transmit
Flashing
In transmitting data
【
Installation
】
Before installation, confirm that the work environment meet the installation require, including the power needs and abundant space. Whether
it is close to the connection equipment and other equipments are prepared or not.
1. Avoid in the sunshine, keep away from the heat fountainhead or the area where in intense EMI.
2. Examine the cables and plugs that installation requirements.
3. Examine whether the cables be seemly or not (less than 100m) according to reasonable scheme.
4. Screw, nut, tool provide by yourself.
5.Power need: 5VDC power inputs
6. Environment: -40°C to 85°C
Relative humidity 10% to 95%
7. Installation: support 2 kinds of wall mounting installation
Wiring Requirements
Cable laying need to meet the following requirements,
1. It is needed to check whether the type, quantity and specification of cable match the requirement before cable laying;
2. It is needed to check the cable is damaged or not, factory records and quality assurance booklet before cable laying;
3. The required cable specification, quantity, direction and laying position need to match construction requirements, and cable length depends
on actual position;
4. All the cable cannot have break-down and terminal in the middle;
5. Cables should be straight in the hallways and turning;